4.5/ 10
Integrity
5.5
Transparency
3.0
Claim Safety
5.0
Documentation
3.5

Audit Analysis

A CDM hydropower project in China with a jurisdictional baseline and investment-test additionality, but the available record is limited to the validation report and PDD with no monitoring data, no buffer pool information, and low extraction confidence. Four material findings (CARs) were raised during validation, and two contradictions between documents reduce confidence in the data. The project is moderate in quality but lacks the depth of evidence needed for a high-confidence assessment.

Red Flags

  • No buffer pool or permanence mechanism is stated in any available document, leaving reversal risk unaddressed for a 7-year crediting period
  • No monitoring reports or verified ERR figures are available; the 554,218 tCO2e figure is an ex-ante claim with no verified counterpart
  • Low extraction confidence across the document set, with one source document listed as 'unknown'
  • Four material findings (CARs) were raised during validation, including a missing parameter in the PDD and outdated grid emission factor

Credit Vintages

IssuedRetiredAvailable
2010
78,972078,972
2011
128,3970128,397
2012
86,800086,800
2013
43,251043,251
Total337,4200337,420

Risk Indicators

Additionality

Investment test present; VVB confirmation not verified in ex

Permanence

no reversal e

Leakage

0% deduction, 'deemed negligible' — reasonable for hydro but

Baseline

Jurisdictional baseline, grid EF 0.497575 (2015), reassessed

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status both not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents