A CDM industrial electricity-generation project (coke dry quenching waste heat recovery) validated and verified by TÜV SÜD with a confirmed combined additionality test, but undermined by a project-specific baseline, a thin 0% leakage justification, an outdated 2005 grid emission factor, and a very large list of 28 corrective actions that had to be resolved before issuance. The project delivered roughly 69% of its pro-rata ex-ante expectation over the monitored period, indicating moderate under-delivery.
Red Flags
- 28 corrective actions were required before issuance, including fundamental issues with the IRR benchmark, baseline scenario identification (captive power plant alternative), and boiler efficiency justification — suggesting the initial PDD was substantially deficient
- Grid emission factor of 1.03 tCO2/MWh is based on 2005 data, which is over a decade old at the time of the 2016 monitoring report and may overstate the baseline
- Leakage deduction of 0% is justified only as 'deemed negligible' with no quantified analysis, which is thin for an electricity-generation project where displaced grid electricity could represent a leakage pathway
- The project delivered only ~69% of the pro-rata ex-ante expectation for the elapsed monitoring period (65,518 tCO2 verified vs ~95,400 tCO2 expected), indicating the ex-ante estimate was optimistic
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 69,994 | 0 | 69,994 | |
| 2011 | 37,291 | 0 | 37,291 | |
| 2012 | 120,481 | 0 | 120,481 | |
| 2013 | 65,520 | 0 | 65,520 | |
| 2017 | 272,616 | 0 | 272,616 | |
| Total | 565,902 | 0 | 565,902 |
Risk Indicators
VVB-confirmed combined test
EE project, no reversal risk
0% deduction, minimal justification
Project-specific, 2005 grid EF
Mentioned but not detailed
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →