Beijing Energy Huolinhe B First Phase 49.5MW Wind Farm Project
#1217of 1935 in Renewable energy#709of 1084 in China#935of 1459 in CDM (UNFCCC)#944of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind project in Inner Mongolia validated under CDM methodology ACM0002 v17.0 by BVI, with a jurisdictional baseline using the 2016 China national grid emission factor. The project is structurally sound for a wind credit, but the extracted record lacks explicit additionality documentation, verified monitoring data, and safeguards detail, and contains a reporting inconsistency in the ERR figures that, while arithmetically reconcilable, reduces confidence in data reliability.
Red Flags
- ERR figures differ by a factor of 7 between the PDD (724,689 tCO2e) and the validation report (103,527 tCO2e); although 103,527 × 7 = 724,689 suggests an annual-vs-lifetime reporting difference, both documents label the value as 'total ERR claimed', creating ambiguity about the actual crediting basis.
- No monitoring or verification reports were found in the extracted record; total verified ERR is not stated, so actual delivery against the ex-ante estimate cannot be assessed.
- Additionality test type and VVB confirmation are not stated in the extracted data, leaving the additionality assessment unconfirmed despite the project having passed validation.
- Late submission of the crediting-period renewal notification (beyond the 180-day deadline) was flagged as a material finding, affecting CER issuance eligibility for the initial period.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 218,607 | 0 | 218,607 | |
| Total | 218,607 | 0 | 218,607 |
Risk Indicators
Test not explicitly stated in extracted record
Wind displacement – minimal reversal risk
0% deduction, deemed negligible per ACM0002
Jurisdictional, 2016 China DNA grid EF
Safeguards mentioned but FPIC/grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →