Benban Solar PV Project (Plot 43_4)
#251of 1935 in Renewable energy#3of 9 in Egypt#115of 1339 in Verra (VCS)#182of 1287 in ACM0002
Audit Analysis
The Benban Solar PV Project (Plot 43_4) is a well-structured renewable energy project with VVB-confirmed additionality and a full match between claimed and verified emissions reductions. However, multiple contradictions across verification reports (baseline method, leakage justification, and ERR figures) and a substantial list of corrective actions (12 CARs) indicate documentation quality issues that temper confidence in the project's data integrity.
Red Flags
- Leakage justification is 'not addressed' per the most recent verification report (Nov 2022), contradicting an earlier report that stated 'deemed negligible' — the 0% deduction lacks a clear, consistent rationale
- Baseline method is contradictory: 'project' in the Nov 2022 verification report vs 'jurisdictional' in the Oct 2022 report, creating ambiguity about the baseline construction
- ERR figures differ between two verification reports (110,329 vs 121,976 tCO2), suggesting either a correction or a data-entry inconsistency that was not fully resolved in the documentation
- 12 corrective actions were raised by the VVB, including inconsistencies in dates, parameter values, methodology version, and use of 'futuristic sentences' in the monitoring report
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 19,681 | 19,681 | 0 | |
| 2020 | 77,187 | 38,595 | 38,592 | |
| 2021 | 78,795 | 9,866 | 68,929 | |
| 2022 | 56,641 | 10,000 | 46,641 | |
| Total | 232,304 | 78,142 | 154,162 |
Risk Indicators
Combined test, VVB-confirmed
Avoidance project, no reversals
0% deduction, justification inconsistent
Project-specific, method contradictory
Grievance & benefits sharing present, FPIC not stated
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →