Bergres Wind Power Project

GS-931 ↗ · current registry ID: GS5229

#600of 1935 in Renewable energy#124of 295 in Turkey#305of 1801 in Gold Standard (GS)#459of 1287 in ACM0002

5.6/ 10
Integrity
6.0
Transparency
5.5
Claim Safety
5.8
Documentation
4.5

Audit Analysis

The Bergres Wind Power Project is a Gold Standard wind project in Turkey with VVB-confirmed additionality and a reasonable grid-emission-factor baseline, but its integrity is weighed down by eight corrective actions and one finding of adverse relevance raised during verification. The project over-delivered relative to its ex-ante estimate for the monitoring period, which is positive for claim safety, yet dual eligibility for both CORSIA and the CCP creates a residual double-claiming risk. Low extraction confidence across the document set and several unquantified monitoring parameters limit the transparency and documentation scores.

Red Flags

  • Eight corrective actions (CAR 1–CAR 8) and one finding of adverse relevance (FAR 1) were raised in the 2025 verification report, indicating unresolved compliance or data-quality issues.
  • The project is simultaneously CORSIA-eligible and CCP-eligible, creating a dual-channel risk that the same emission reductions could be claimed in two separate markets.
  • The additionality test type is inconsistent across documents: the validation report (2024) records an investment test while a monitoring report (2022) records a combined test, leaving the exact basis of the additionality claim ambiguous.
  • Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and some facts may be incomplete or misread.

Credit Vintages

IssuedRetiredAvailable
2017
78,82278,8220
2018
117,561117,49863
2019
123,933123,9330
2020
130,071128,6151,456
2021
131,172127,6123,560
2022
137,426109,81827,608
2023
112,35751,58560,772
2024
147,875150147,725
2025
40,174040,174
Total1,019,391738,033281,358

Risk Indicators

Additionality

VVB-confirmed (RINA); investment test per validation report

Permanence

Avoidance project; no sequestration-reversal risk

Leakage

0% deduction with quantified justification; appropriate for wind

Baseline

Project-specific grid-EF baseline; last reassessed 2024

Safeguards

FPIC conducted; grievance mechanism and benefit sharing documented

Double-claim

CORSIA-eligible AND CCP-eligible; dual-channel risk present

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents