Berlin Binary Cycle power plant

CDM-1218 ↗

#918of 1935 in Renewable energy#3of 5 in El Salvador#652of 1459 in CDM (UNFCCC)#718of 1287 in ACM0002

5.2/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.0
Documentation
5.0

Audit Analysis

The Berlin Binary Cycle geothermal project in El Salvador is a CDM-registered renewable energy project with VVB-confirmed additionality and a reasonable leakage treatment, but it is undermined by a project-specific baseline with contradictory characterisation across documents, a 2005 grid emission factor, 17 material findings including a capacity discrepancy, and three outstanding corrective actions. Verified emission reductions for the 2014 monitoring period were lower than PDD estimates, which is reassuring for over-crediting risk, yet the absence of FNRB, usage-rate, and CORSIA/CCP data leaves significant transparency gaps.

Red Flags

  • Installed capacity in the PDD (9.2 MW) differed from nameplate capacity (11.56 MW); the verification report confirmed 9.2 MW due to thermodynamic limits, but the PDD was never formally updated (CAR outstanding).
  • Grid emission factor of 0.693 tCO2/MWh is drawn from 2005 data, making the baseline reference value potentially outdated for a project operating through 2014.
  • Three corrective actions remain open, including incomplete stakeholder comment summary and an inadequate monitoring-indicators table, indicating unresolved documentation deficiencies.
  • The baseline method is characterised as 'project-specific' in the 2015 monitoring report but 'jurisdictional' in an earlier document, creating ambiguity about the baseline's robustness.

Credit Vintages

IssuedRetiredAvailable
2011
21,108021,108
2012
62,108062,108
2013
36,303036,303
2014
73,715073,715
2016
37,122037,122
Total230,3560230,356

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deemed negligible, reasonable for power plant

Baseline

Project-specific, 2005 grid EF, method contradiction

Safeguards

Safeguards mentioned, benefit sharing described, but FPIC an

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents