Audit Analysis
The Berlin Binary Cycle geothermal project in El Salvador is a CDM-registered renewable energy project with VVB-confirmed additionality and a reasonable leakage treatment, but it is undermined by a project-specific baseline with contradictory characterisation across documents, a 2005 grid emission factor, 17 material findings including a capacity discrepancy, and three outstanding corrective actions. Verified emission reductions for the 2014 monitoring period were lower than PDD estimates, which is reassuring for over-crediting risk, yet the absence of FNRB, usage-rate, and CORSIA/CCP data leaves significant transparency gaps.
Red Flags
- Installed capacity in the PDD (9.2 MW) differed from nameplate capacity (11.56 MW); the verification report confirmed 9.2 MW due to thermodynamic limits, but the PDD was never formally updated (CAR outstanding).
- Grid emission factor of 0.693 tCO2/MWh is drawn from 2005 data, making the baseline reference value potentially outdated for a project operating through 2014.
- Three corrective actions remain open, including incomplete stakeholder comment summary and an inadequate monitoring-indicators table, indicating unresolved documentation deficiencies.
- The baseline method is characterised as 'project-specific' in the 2015 monitoring report but 'jurisdictional' in an earlier document, creating ambiguity about the baseline's robustness.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 21,108 | 0 | 21,108 | |
| 2012 | 62,108 | 0 | 62,108 | |
| 2013 | 36,303 | 0 | 36,303 | |
| 2014 | 73,715 | 0 | 73,715 | |
| 2016 | 37,122 | 0 | 37,122 | |
| Total | 230,356 | 0 | 230,356 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deemed negligible, reasonable for power plant
Project-specific, 2005 grid EF, method contradiction
Safeguards mentioned, benefit sharing described, but FPIC an
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →