Berrybrook Organic Farms
Score Breakdown
Integrity
verified The verification report confirms additionality was checked by the VVB, Control Union Malaysia.
missing Baseline method, leakage treatment, buffer pool coverage, and reversal history are not stated in the extracted record.
Transparency
verified A named VVB and a defined monitoring period from 2024-01-01 to 2024-12-31 are available.
missing Key MRV and issuance fields, including verified and claimed ERR totals, are not found in the available documents.
Claim Safety
verified Third-party verification by Control Union Malaysia provides some support for the claim.
missing Missing baseline, leakage, and issuance data leave meaningful uncertainty about over-crediting and claim robustness.
Documentation
verified Three documents were used, including a verification report, validation report, and issuance record.
missing The extracted record is incomplete on several core fields, and no corrective actions or material findings context is available beyond empty lists.
Detailed Analysis
Integrity
The verification report confirms additionality was reviewed by the VVB, which is a positive sign for project integrity. However, the extracted record does not state the baseline method, any leakage deduction or justification, buffer pool coverage, or any reversal events, so permanence and baseline robustness cannot be well assessed. No material findings or corrective actions were reported, but the absence of key methodological details keeps the score only moderate.
Transparency
Transparency is limited because the record does not provide verified or claimed issuance totals, leakage treatment, baseline details, or usage monitoring information. The presence of a named verifier, Control Union Malaysia, and a clear monitoring period helps, but these are not enough to offset the missing MRV specifics. With several core fields not found in available documents, the disclosure quality remains weak.
Claim Safety
Claim safety is constrained by the lack of baseline, leakage, and issuance data, which are central to judging over-crediting risk. The VVB confirmation of additionality helps, but without a stated baseline method or quantified leakage treatment, the risk of overstated climate claims remains material. No contradictions were reported, but the evidence base is too thin to support a high-confidence claim.
Documentation
Documentation quality is mixed: three documents were used, including a verification report, validation report, and issuance record, and the extraction confidence is medium. That said, many important fields are not stated in the extracted record, including the baseline method, leakage treatment, and issuance totals. The absence of material findings and corrective actions is positive, but the overall documentation remains incomplete.
Overall
The project has some credibility from third-party verification and a defined monitoring period, but the available record is missing too many core details to support a strong score. There are no listed contradictions to resolve, so no document was privileged over another on conflicting facts. Because the extracted evidence does not include baseline, leakage, buffer, or issuance totals, the assessment remains cautious and only moderately positive.
Audit Analysis
The verification report shows third-party confirmation of additionality, but many core methodological details are not stated in the extracted record. With no baseline method, leakage treatment, buffer pool, or reversal information available, the project’s integrity and claim safety are only moderate. Transparency is weak because key MRV and registry details are missing, though the documentation is not unusable.
Project Description
Credits issued: 175
Red Flags
- No baseline method, leakage treatment, or buffer pool information was found in the available documents.
- No total verified or claimed issuance figures were extracted, limiting assessment of over-crediting risk and registry transparency.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 175 | 5 | 170 | |
| Total | 175 | 5 | 170 |
Cosa migliorerebbe questo punteggio
- Provide the full baseline methodology, including any reassessment history and the rationale for the chosen baseline.
- Disclose verified and claimed issuance totals, leakage treatment, buffer pool coverage, and any reversal or safeguard documentation.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
No reversal or buffer data stated
Leakage treatment not stated
Baseline method not stated
No safeguards evidence found
Registry eligibility status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →