Bii Stinu Wind Energy Project
#340of 770 in Renewable energy#8of 27 in Mexico#98of 213 in CDM (UNFCCC)#254of 383 in ACM0002
Audit Analysis
The Bii Stinu Wind Energy Project is a CDM-registered wind generation project in Mexico with a solid combined additionality test confirmed by AENOR and a jurisdictional grid baseline. However, the available record contains only validation-stage documents; no verification or monitoring reports were found, making it impossible to confirm actual credit delivery or long-term performance. Several material findings at validation (permitting, baseline data completeness, investment analysis) and a low extraction confidence level further limit confidence in the project's documented integrity.
Red Flags
- No verification or monitoring reports found in the extracted record — actual credit issuance and performance cannot be confirmed
- Leakage justification is inconsistent: the PDD states leakage is 'deemed negligible' while the validation report records it as 'not addressed'
- Five material findings at validation required corrective actions (construction permit, DNA approval letter, baseline data clarification, investment analysis detail, wind resource report), indicating documentation gaps at the time of approval
- Grid emission factor is from 2005 with no evidence of subsequent reassessment or update
- Minimum extraction confidence is rated low, suggesting at least one key document was poorly readable
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
No monitoring data; no reversal evidence
0% deduction; justification inconsistent
Jurisdictional grid EF, 2005 vintage
Grievance & benefit sharing present; FPIC not stated
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →