CDMMethane avoidanceNepalGeneral Methodologyv2.0

Biogas Support Program - Nepal (BSP-Nepal) Activity-1

CDM-0136 ↗

#25of 111 in Biogas#5of 14 in Nepal#60of 213 in CDM (UNFCCC)

5.4/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
5.0
Documentation
6.0

Audit Analysis

A CDM biogas methane-avoidance project in Nepal with a standard investment-test additionality assessment and a 5% quantified leakage deduction. The project shows reasonable conservatism in using a verified usage rate (85.79%) well below the assumed 100%, but documentation gaps around permanence, FPIC, and verified ERR figures limit confidence. Several procedural material findings were identified and corrected, indicating initial documentation weaknesses that were subsequently addressed.

Red Flags

  • Total verified ERR figure not found in any available document, preventing independent cross-check of claimed credits
  • No buffer pool or permanence mechanism documented despite the 7-year crediting period
  • Free, Prior and Informed Consent (FPIC) not documented in any available record
  • Six material findings in the verification report, all procedural but indicating initial PDD and monitoring documentation did not align with the latest methodology version
  • Contradiction in total ERR claimed (31,291 vs 45,581) across two monitoring reports requires clarification of which figure applies to which period

Credit Vintages

IssuedRetiredAvailable
2011
60,404060,404
2013
189,6980189,698
2014
25,939025,939
2015
25,516025,516
2016
26,105026,105
2017
24,098024,098
2018
25,516025,516
2019
21,378021,378
2020
33,006033,006
2021
45,580045,580
Total477,2400477,240

Risk Indicators

Additionality

Investment test present; VVB verification not explicitly con

Permanence

No buffer pool documented; methane avoidance has lower rever

Leakage

5% quantified deduction applied

Baseline

Project-specific baseline, reassessed 2019; not jurisdiction

Safeguards

Grievance mechanism and benefit sharing present; FPIC not do

Double-claim

CORSIA and CCP status both unstated; dual-channel risk not e

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents