Biomass Based Power Generation Plant at Village Channu, Punjab
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the verification report reported no material findings.
missing The baseline is described only as project-based, with no reassessment date found, and leakage is only described as deemed negligible without a quantified deduction.
Transparency
verified The monitoring period and crediting period are stated, and the VVB is identified as 4K Earth Science Private Limited.
missing The monitoring report still asked for missing records and dates, and the extracted record does not state the monitoring method or usage monitoring approach.
Claim Safety
verified The project is not shown to have double registration or dual issuance in the extracted record.
missing The emissions reductions totals conflict across documents, and the claim relies on a project baseline with no quantified leakage deduction.
Documentation
verified Fourteen documents were used, and extraction confidence is high.
missing The monitoring report lists multiple corrective actions, including missing consent-to-operate and boiler inspection documents, logbooks, and calibration certificates.
Detailed Analysis
Integrity
The verification report supports additionality, and the extracted record shows no material findings, which is positive for project integrity. However, the baseline is only described as project-based, the last reassessment date is not found, and leakage is treated as negligible without a quantified deduction. The monitoring report also lists several unresolved corrective actions, which weakens confidence in the robustness of the emissions accounting.
Transparency
Transparency is mixed because the monitoring period, crediting period, registry, and VVB are identified, but the record does not state the monitoring method or usage monitoring approach. The monitoring report still requested missing start and end dates in the spreadsheet, plus logbooks and calibration evidence, which suggests incomplete disclosure. The documentation is usable, but not fully complete or clean.
Claim Safety
Claim safety is moderate rather than strong because the project uses a project baseline and does not provide a quantified leakage deduction, even though leakage is described as negligible. The emissions reductions figure changed from 394,873 in earlier monitoring and validation documents to 216,660 in later ones, and I privileged the later figures because they are more recent and appear to reflect the updated issuance package. That said, the contradiction itself lowers confidence in the claim size.
Documentation
Documentation quality is fair: fourteen documents were used and extraction confidence is high, which supports a reasonably solid evidence base. Still, the monitoring report contains multiple corrective action requests, including missing operating permits, boiler inspection certificates, plant logbooks, and calibration records. The recency of the monitoring period is acceptable, but the package is not fully complete.
Overall
I privileged the later 2022 monitoring and validation figures for emissions reductions because they are more recent than the earlier 2022 documents, but the change from 394,873 to 216,660 remains a material contradiction that reduces reliability. I also privileged the later monitoring-report statements on FPIC, grievance mechanism, safeguards, and benefit sharing because they are more recent than the earlier negative entries, but the contradiction still warrants a downward adjustment. Overall quality is middling: the project has some credible elements, but missing methodological detail, unresolved corrective actions, and inconsistent reported figures limit confidence.
Audit Analysis
The project has some positive integrity signals, including VVB-confirmed additionality and no reported material findings, but key methodological details are missing and the monitoring package contains several corrective action requests. The credit volume was revised downward from earlier documents, and the record shows contradictions on emissions reductions and safeguards that reduce confidence in the claims.
Project Description
Proponent: Universal Biomass Energy Private Limited Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: AMS-I.D. Estimated annual GHG reductions: 74891 tCO2e Region: Asia Registration date: 2011-07-21
Red Flags
- The emissions reductions figure changed from 394,873 to 216,660 across documents, indicating a material inconsistency that needed reconciliation.
- Several monitoring-report corrective actions were still requested, including missing operating permits, boiler inspection evidence, logbooks, and calibration records.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 11,200 | 11,200 | 0 | |
| 2010 | 76,434 | 76,434 | 0 | |
| 2011 | 7,650 | 7,650 | 0 | |
| Total | 95,284 | 95,284 | 0 |
Cosa migliorerebbe questo punteggio
- Provide a fully reconciled emissions-reductions trail explaining the change from 394,873 to 216,660 and linking it to the final issuance calculation.
- Publish complete monitoring evidence, including operating permits, boiler inspection certificates, logbooks, calibration records, and a clearly described monitoring and usage methodology.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
No reversal events reported
Deemed negligible without quantified deduction
Project baseline with no reassessment date
Safeguards present but earlier contradictions exist
No dual-claim evidence stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →