Audit Analysis
A CDM biomass power plant in Chhattisgarh, India, with VVB-confirmed additionality and conservative credit delivery (66.5% of pro-rata expectation), but undermined by seven material findings at validation, a contradiction in how leakage was treated, and the absence of FPIC, a grievance mechanism, and independently verified storage data. The project is explicitly excluded from CORSIA, reducing double-claim risk, yet the overall documentation and safeguards picture is incomplete.
Red Flags
- Seven material findings raised at validation, including a discrepancy in biomass cost used for the investment barrier analysis (1,100 vs 1,200 Rs/Ton), missing N2O and NH3/NOx emission calculations, and an inconsistency in truck-load figures in leakage equations.
- Contradiction between the monitoring report (leakage 'quantified') and the validation report (leakage 'deemed negligible') creates uncertainty about whether leakage was actually measured or simply assumed away.
- No FPIC conducted, no grievance mechanism in place, and benefit-sharing not confirmed by the VVB — significant safeguards gaps for a project operating in a rural Indian community.
- Total verified ERR figure is not stated in the extracted record, preventing independent confirmation of the 48,156 tCO2e claimed in the monitoring report.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 46,960 | 0 | 46,960 | |
| Total | 46,960 | 0 | 46,960 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
Contradiction: quantified vs deemed negligible
Project-specific, grid EF 2005, method contradiction
No FPIC, no grievance mechanism
CORSIA excluded, CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →