Skip to main content
CDMBiomass EnergyIndiaAMS-I.D

Biomass based Power Plant in Polakpalli Village, Gulbarga District, Karnataka

CDM-2895 ↗

#140of 352 in Biomass#693of 975 in India#1019of 1459 in CDM (UNFCCC)#419of 806 in AMS-I.D

4.7/ 10
Integrity
6.5
Transparency
3.5
Claim Safety
4.0
Documentation
3.5

Audit Analysis

A CDM biomass power plant in Karnataka, India, validated by TÜV SÜD with a jurisdictional baseline and investment-test additionality, but the available record is limited to validation-stage documents with no verification or monitoring data. A significant discrepancy between the PDD's claimed 215,915 tCO₂e and the VVB-validated 30,845 tCO₂e raises over-crediting concerns, and the low extraction confidence further limits confidence in the extracted data.

Red Flags

  • The PDD (2010-03-22) claims 215,915 tCO₂e while the validation report (2010-03-31) validates only 30,845 tCO₂e — a roughly 7-to-1 gap that signals the project proponent's initial assumptions were substantially overstated.
  • No verification report, monitoring report, or issuance data with actual delivered credits is present in the extracted record, making it impossible to confirm whether the validated figure was actually achieved.
  • Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and the extracted facts may be incomplete.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Investment test, VVB-confirmed

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, 'deemed negligible' only

Baseline

Jurisdictional, grid EF 0.853

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26AMS I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.