Biomass based Power Project in West Bengal
#156of 352 in Biomass#726of 975 in India#1078of 1459 in CDM (UNFCCC)#436of 806 in AMS-I.D
Audit Analysis
A CDM biomass power project in West Bengal with a confirmed investment-test additionality and a standard jurisdictional grid baseline, but significant documentation gaps at validation (8 material findings, 10 corrective actions) and no verification or monitoring data available to confirm the 559,597 tCO₂e lifetime claim. The 0% leakage deduction is justified as 'deemed negligible' yet the validation report itself flagged that transportation-related leakage was not discussed in the PDD, and feedstock sustainability was not demonstrated.
Red Flags
- Validation report lists 8 material findings including undemonstrated renewable biomass status, unaddressed transportation leakage, and incomplete monitoring plan for biomass quantity and NCV
- No verification or monitoring reports found in the extracted record; the 559,597 tCO₂e lifetime claim is unverified
- Feedstock sustainability and carbon content testing are not stated in any available document, a material gap for a biomass project
- Leakage deduction of 0% justified as 'deemed negligible' while the validation report explicitly notes transportation leakage was not discussed in the PDD
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, transportation not discussed
Jurisdictional grid EF (0.9035, 2012)
Mentioned but FPIC and grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →