Skip to main content
GSBiomass, or Liquid Biofuel - ElectricityIndiaAMS-I.D

Biomass based power project of VPL

GS-1576 ↗ · current registry ID: GS6607

#230of 352 in Biomass#871of 975 in India#1592of 1801 in Gold Standard (GS)#532of 806 in AMS-I.D

4.0/ 10
Integrity
4.5
Transparency
3.5
Claim Safety
4.0
Documentation
4.0

Audit Analysis

A Gold Standard biomass power project in India with VVB-confirmed additionality and recent baseline reassessment, but undermined by six corrective action requests, two findings, a significant gap between claimed and verified emissions reductions (approximately 48% of the claim was verified), an unresolved energy-source contradiction (mixed vs. renewable), and the absence of a buffer pool or reversal-risk treatment. The low extraction confidence and multiple cross-document contradictions further erode confidence in the project's data integrity.

Red Flags

  • Six corrective action requests (CAR-01 through CAR-06) and two findings (FAR-01, FAR-02) reported in the 2025 verification report, indicating recurring compliance deficiencies
  • Verified ERR of 18,631 tCO₂e represents only ~48% of the 38,657 tCO₂e claimed in the monitoring report for the same period, a substantial under-verification gap
  • Energy source described as 'mixed' in the December 2023 monitoring report but 'renewable' in the October 2023 report — if non-renewable co-firing is involved, the carbon-content calculation and credit validity are at risk
  • No buffer pool percentage stated and reversal events explicitly 'not addressed' in the verification report, leaving permanence risk unquantified
  • CORSIA eligibility confirmed while CCP status is not stated, creating potential dual-channel crediting risk

Credit Vintages

IssuedRetiredAvailable
2017
14,52114,5210
2018
44,77044,7700
2019
45,92045,9200
2020
46,56016,41230,148
2021
48,94123,51525,426
2022
31,60463130,973
2023
38,65777337,884
Total270,973146,542124,431

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

reversals not addressed

Leakage

0% with negligible justification (power project)

Baseline

Project-specific; reassessed 2023

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CORSIA-eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents