Bosques Solares de los Llanos 1
#1296of 1935 in Renewable energy#81of 124 in Colombia#60of 99 in CerCarbono (CC)#1007of 1287 in ACM0002
Audit Analysis
Bosques Solares de los Llanos 1 is a solar PV avoidance project under the well-established ACM0002 methodology in Colombia's CerCarbono registry. The project shows no material findings, no corrective actions, and conservative ERR figures (84% of pro-rata expectation), but the available documentation is limited to a single validation report, leaving additionality test details, baseline methodology, and buffer pool arrangements unconfirmed in the extracted record.
Red Flags
- Additionality test type and VVB confirmation are not stated in the available validation report, leaving the additionality assessment unverified in the extracted record
- Baseline methodology and last reassessment date are not stated, preventing independent verification of the grid emission factor used
- Only one document (validation report) is available; no monitoring report, PDD, or verification report was found in the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 9,187 | 9,050 | 137 | |
| 2021 | 26,873 | 26,863 | 10 | |
| 2022 | 1,142 | 1,142 | 0 | |
| Total | 37,202 | 37,055 | 147 |
Risk Indicators
Test type and VVB confirmation not stated in available record
Avoidance project, no reversal events reported
0% deduction with quantified justification, reasonable for solar PV
Method and reassessment date not stated; grid EF unconfirmed
FPIC conducted and safeguards mentioned, but grievance mechanism not stated
CORSIA and CCP status both not stated; dual-channel risk unassessed
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →