Skip to main content
GSOtherCôte d'IvoireACM0002

Boundiali solar power plant

GS-4449 ↗ · current registry ID: GS12486

#297of 1935 in Renewable energy#122of 1801 in Gold Standard (GS)#219of 1287 in ACM0002

6.1/ 10
Integrity
6.5
Transparency
6.0
Claim Safety
6.0
Documentation
5.5

Audit Analysis

The Boundiali Solar Power Plant is a Gold Standard grid-connected solar project in Côte d'Ivoire with VVB-verified additionality and a jurisdictional baseline, but carries moderate concerns from seven corrective action requests, a leakage justification contradiction between documents, and CORSIA eligibility creating dual-channel risk. The project delivered approximately 92.5% of its pro-rata ex-ante expectation for the elapsed monitoring period, indicating reasonable but not exceptional performance.

Red Flags

  • Seven corrective action requests (CARs) and one forward action request (FAR) raised during verification, including missing installed capacity documentation and calibration details
  • CORSIA eligibility confirmed while CCP status is not stated, creating potential dual-channel credit risk
  • Leakage justification contradicts between the verification report (not addressed) and the monitoring report (deemed negligible), with a 0% deduction applied
  • A grievance was received from a local NGO in November 2024 regarding lack of jobs for villagers, indicating community relations concerns

Credit Vintages

IssuedRetiredAvailable
2023
14,674014,674
2024
28,721028,721
Total43,395043,395

Risk Indicators

Additionality

VVB-verified combined test

Permanence

Avoidance project, no reversals

Leakage

0% deduction, justification inconsistent

Baseline

Jurisdictional, 2021 grid EF

Safeguards

FPIC, grievance, benefit sharing

Double-claim

CORSIA-eligible, CCP not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents