Boyabat Hydroelectric Power Plant
#1157of 1935 in Renewable energy#24of 26 in Türkiye#775of 1339 in Verra (VCS)#904of 1287 in ACM0002
Audit Analysis
The Boyabat Hydroelectric Power Plant is a registered VCS avoidance project with a verified additionality test and a reputable VVB, but its integrity is significantly undermined by four material findings that question whether the project is truly additional given its long operating history, 21 outstanding corrective actions, and a project-specific baseline. The project is under-delivering relative to its ex-ante estimate (actual ER approximately 50% lower due to seasonal conditions), which limits over-crediting risk but raises questions about the robustness of the original baseline assumptions. Multiple contradictions across documents, particularly in ERR figures and baseline methodology, reduce confidence in the data record.
Red Flags
- Four material findings in the 2023 verification report directly challenge additionality, asking the proponent to explain why the project is not business-as-usual given its history and why it was not developed earlier when the option was available
- 21 corrective actions (CAR-1 through CAR-22, excluding CAR-18) remain outstanding, indicating systemic documentation and compliance gaps
- Leakage deduction is 0% with no justification provided in the most recent verification report (2023), while the earlier 2022 report indicated leakage was quantified — a regression in rigor
- Baseline methodology is inconsistent across documents: the 2023 verification report describes a project-specific baseline while the 2022 monitoring report references a jurisdictional baseline
- Actual ER is approximately 50% lower than the ex-ante estimate in the approved PDD, attributed to seasonal conditions, raising questions about the robustness of the original baseline assumptions
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 657,707 | 649,347 | 8,360 | |
| 2014 | 216,089 | 0 | 216,089 | |
| 2015 | 389,352 | 0 | 389,352 | |
| 2016 | 347,851 | 0 | 347,851 | |
| 2017 | 245,899 | 0 | 245,899 | |
| 2018 | 196,537 | 0 | 196,537 | |
| 2019 | 273,972 | 0 | 273,972 | |
| 2020 | 11,649 | 9,700 | 1,949 | |
| Total | 2,339,056 | 659,047 | 1,680,009 |
Risk Indicators
VVB-verified but materially questioned
Avoidance project, minimal reversal risk
0% deduction, no justification in latest report
Project-specific, inconsistent across documents
FPIC, grievance mechanism, benefit sharing documented
CORSIA-excluded, CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →