Vai al contenuto principale
VCS avoidance Türkiye Registry: Registered Documentazione completa General Methodology v2.0

Boyabat Hydroelectric Power Plant

VCS-1345 ↗

4.2 / 10
Integrity
4.2
Transparency
4.8
Claim Safety
4.1
Documentation
3.2

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using an investment test, and the baseline was reassessed in 2020 under ACM0002.

missing The verification report raised multiple concerns about business-as-usual status, project history, and title/licensing clarity, with many corrective actions required.

Transparency

verified The monitoring period and verified emissions reductions are stated, and the claimed and verified totals match at 1,681,349 tCO2e.

missing The monitoring method for usage was not found, and the low extraction confidence means some key source material may have been difficult to read.

Claim Safety

verified The project is not CORSIA-eligible, which lowers dual-market claim risk.

missing Leakage is only described as negligible with no quantified deduction, and the record shows unresolved questions around baseline credibility and additionality.

Documentation

verified The file set is relatively broad, with 24 documents used and a recent document date in 2023.

missing Extraction confidence was low, and the record includes many corrective actions plus contradictions across documents on safeguards and the crediting period.

Detailed Analysis

Integrity

The project has some positive integrity signals: the VVB confirmed additionality through an investment test, the baseline method is project-based under ACM0002, and the baseline was last reassessed in 2020. However, the verification findings explicitly asked the proponent to justify why the project was not business as usual, explain why it was not developed earlier, and clarify licensing and ownership history, which are material integrity concerns. Leakage is only described as negligible, and reversal risk is not addressed in the extracted record.

Transparency

The monitoring period is stated as 2020-05-01 to 2022-11-28, and the claimed and verified emission reductions are identical at 1,681,349 tCO2e, which is a positive sign for registry consistency. On the other hand, the usage monitoring method is not found in the available documents, and the low extraction confidence suggests at least one key source was poorly readable. The record is therefore only moderately transparent rather than strong.

Claim Safety

Claim safety is weakened by the project-specific baseline and the absence of a quantified leakage deduction, even though leakage is described as negligible. The project is not CORSIA-eligible, which reduces one channel of claim risk, but the record does not provide enough evidence to rule out over-crediting concerns given the verification questions about additionality and project history. The matching claimed and verified totals help, but they do not offset the broader uncertainty.

Documentation

Documentation breadth is decent, with 24 documents used and a recent 2023 document date, and the project also has a named VVB. But the extraction confidence is low, which lowers trust in the record, and the verification process required many corrective actions. Several important items are either not found or not stated, including usage monitoring details and buffer pool information.

Overall

I privileged the more recent and more specific 2023 statements for safeguards, FPIC, grievance handling, leakage, and the crediting period over older 2014 statements, because the contradictions show the project documentation evolved over time. Even so, the contradictions themselves are a reliability problem and I scored downward accordingly, especially because the verification report raised substantive questions about business-as-usual status and ownership/licensing history. The project is registered and has some positive MRV features, but the overall evidence quality is only moderate.

Audit Analysis

This is a registered VCS hydropower project with VVB-verified additionality and a recent baseline reassessment, but the record shows substantial reliability concerns. Multiple corrective actions and unresolved questions about business-as-usual status, licensing history, and ownership weaken confidence in the crediting claims.

Project Description

The Boyabat Hydroelectric Power Plant is a renewable energy project designed to supply 513 MW of electricity to the Turkish power grid. The project is located on the Kızılırmak river and is expected to produce 1,370,000 MWh of electricity annually, while reducing CO2 emissions by 580,882 tonnes. By replacing grid-connected power plants, the Boyabat HPP is an important step towards a cleaner energy future in Turkey.

Red Flags

  • A large set of corrective actions was required, and the verification findings questioned whether the project was truly non-business-as-usual.
  • The record contains contradictions on safeguards, grievance handling, FPIC, leakage treatment, and the crediting period, which reduces trust in the documentation.

Credit Vintages

Issued Retired Available
2013
657,707 649,347 8,360
2014
216,089 0 216,089
2015
389,352 0 389,352
2016
347,851 0 347,851
2017
245,899 0 245,899
2018
196,537 0 196,537
2019
273,972 0 273,972
2020
11,649 9,700 1,949
Total 2,339,056 659,047 1,680,009

Cosa migliorerebbe questo punteggio

  • Provide a clear, fully traceable explanation of additionality, business-as-usual status, and project licensing/ownership history in a single reconciled document.
  • Publish complete monitoring and safeguards documentation, including usage monitoring details, leakage treatment, and a resolution of all corrective actions and contradictions.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed but challenged

Permanence

No buffer pool stated

Leakage

Negligible but unquantified

Baseline

Project baseline, reassessed in 2020

Safeguards

FPIC and grievance mechanism documented

Double-claim

Not CORSIA-eligible

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-18 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti