Braço Norte IV Small Hydro Plant

CDM-0668 ↗

#1085of 1935 in Renewable energy#90of 211 in Brazil#814of 1459 in CDM (UNFCCC)

5.0/ 10
Integrity
4.8
Transparency
5.5
Claim Safety
4.5
Documentation
5.2

Audit Analysis

The Braço Norte IV small hydro project is a CDM-registered renewable energy project with a verified investment-test additionality assessment by TÜV NORD CERT, but it carries a heavy burden of material findings (16 total, including 7 corrective actions) covering calculation errors, unclear emission-factor methodology, and stakeholder-consultation deficiencies. The absence of a buffer pool, inconsistent leakage treatment, and contradictory grid emission-factor values across documents introduce meaningful over-crediting and data-reliability risk. Overall the project is functional but sits in the lower-middle quality band.

Red Flags

  • Grid emission factor contradicts itself across monitoring reports: 0.5364 tCO₂/MWh (Jan 2013 report) vs 0.389 tCO₂/MWh (undated report) — a 38 % swing that directly affects credit quantities.
  • Seven corrective actions (CARs) were required, including an incorrect crediting-period start date, miscalculated months in first/last year, and inapplicable Step-0 additionality discussion, indicating material errors in the PDD.
  • No buffer pool is recorded and leakage is listed as 0 % with the justification marked 'not addressed' in the 2013 monitoring report, despite the validation report claiming it was 'quantified' — an unresolved inconsistency.
  • Stakeholder consultation was deficient: local communities, NGOs, and the Public Attorney were not initially invited (CAR 7), and no grievance mechanism or FPIC is documented.
  • Multiple non-material findings (NIRs) flag that the emission-factor calculation was unclear in the PDD and that meter calibration procedures were missing from the monitoring plan.

Credit Vintages

IssuedRetiredAvailable
2008
34,905034,905
2009
23,130023,130
2010
25,974025,974
2012
133,8230133,823
2013
26,660026,660
Total244,4920244,492

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

low inherent risk (hydro)

Leakage

0% deduction, justification inconsistent across docs

Baseline

Project-specific; EF contradiction unresolved

Safeguards

No FPIC, no grievance mechanism, CAR 7

Double-claim

Not CORSIA-eligible; CCP not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents