Audit Analysis
The Bucakkisla HPP is a registered VCS run-of-river hydro project with a confirmed investment additionality test and a well-known VVB (Applus+), but it is undermined by a 0% leakage deduction with no justification in the most recent verification report, a significant unaddressed capacity increase from 33.5 MW to 41 MW, and a major discrepancy between two verification reports on verified emissions (48,801 vs 389,801 tCO₂). The project delivered roughly 58% of the pro-rata lifetime expectation for the elapsed monitoring period, which is within plausible range for hydro variability but warrants scrutiny.
Red Flags
- Two verification reports from the same year (Jan 2022 and Aug 2022) report vastly different verified ERR figures: 389,801 tCO₂ vs 48,801 tCO₂ — a factor-of-eight discrepancy that is unexplained in the extracted record.
- Leakage deduction is 0% and the most recent verification report (Aug 2022) states the justification as 'not addressed', while an earlier verification report (Jan 2022) called it 'deemed negligible' — the treatment is inconsistent and insufficiently documented.
- A capacity increase from 33.50 MW to 41.00 MW was flagged as a corrective action (CAR 01) with potential impact on methodology applicability, additionality, and baseline, yet no resolution is documented.
- No buffer pool is in place and no reversal events data is available, leaving permanence risk unquantified for a project whose infrastructure (dam, turbines) could be decommissioned or repurposed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 88,592 | 18,854 | 69,738 | |
| 2016 | 39,920 | 15,780 | 24,140 | |
| 2017 | 112,358 | 10,640 | 101,718 | |
| 2018 | 3,003 | 3,003 | 0 | |
| 2019 | 84,011 | 1,368 | 82,643 | |
| 2021 | 43,804 | 8,579 | 35,225 | |
| 2022 | 4,997 | 2,992 | 2,005 | |
| Total | 376,685 | 61,216 | 315,469 |
Risk Indicators
VVB-confirmed investment test
reversal data absent
0% deduction, justification 'not addressed'
Project-specific; capacity change unaddressed
Grievance mechanism present; FPIC not conducted; 8 social CARs open
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →