BUENOS AIRES RENEWABLE ENERGY PROJECT

GS-309 ↗ · current registry ID: GS2290

#1407of 1935 in Renewable energy#133of 211 in Brazil#1275of 1801 in Gold Standard (GS)#45of 60 in AMS-I.E

4.5/ 10
Integrity
4.0
Transparency
4.5
Claim Safety
5.0
Documentation
5.0

Audit Analysis

The Buenos Aires Renewable Energy Project (GS-309) is a Gold Standard renewable energy avoidance project in Brazil with VVB-confirmed additionality and no reported reversal events, but its integrity is significantly undermined by four material findings including non-compliance with site-visiting frequency requirements and a 19,062 tCO2e deduction (38% of claimed ERs) for prior-period non-compliance. Nine contradictions across documents—spanning leakage justification, ERR figures, FNRB units, additionality test type, and safeguards—raise concerns about data consistency and MRV reliability. The project over-delivered relative to its pro-rata expectation for the 2017–2019 monitoring period, but the absence of a buffer pool, unknown CCP/CORSIA status, and project-specific baseline limit confidence in the credit's long-term integrity.

Red Flags

  • Site-visiting frequency did not meet Gold Standard requirements during the 2017–2019 monitoring period, triggering a Forward Action Request and a 19,062 tCO2e deduction (38% of the 49,612 tCO2e claimed)
  • Nine contradictions between documents, including conflicting leakage justifications ('quantified' vs 'deemed negligible'), conflicting additionality test types ('investment' vs 'combined'), and conflicting FPIC status (false in validation report vs true in 2013 stakeholder consultation)
  • CCP status and CORSIA eligibility are both not stated in any available document, leaving dual-channel risk unassessed
  • The deviation request to convert the fixed crediting period to a renewable 5×3-year structure was not approved, indicating the project could not extend its crediting period

Credit Vintages

IssuedRetiredAvailable
2012
26,44624,2672,179
2013
24,17521,4452,730
2014
21,84220,5111,331
2015
25,80517,0078,798
2016
22,27910,88811,391
2017
15,8402,00213,838
2018
11,94523811,707
2019
15,1713,92111,250
Total163,503100,27963,224

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

avoidance type

Leakage

Quantified; 0% reasonable for RE

Baseline

Project-specific; no reassessment date

Safeguards

Documented in 2021; FPIC not conducted

Double-claim

CCP and CORSIA status unknown

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS-I.E

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents