Bundled 3.0 MW Wind Energy Project in Tamilnadu

CDM-1121 ↗

#347of 1935 in Renewable energy#185of 975 in India#220of 1459 in CDM (UNFCCC)#128of 806 in AMS-I.D

6.0/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
6.0
Documentation
5.5

Audit Analysis

A 3.0 MW bundled wind project in Tamil Nadu under CDM with a VVB-confirmed combined additionality test and a reasonable 0% leakage deduction for a grid-displacement avoidance project. However, a contradiction in the baseline method between the validation report and monitoring report, the absence of a verified ERR figure, and 15 material findings at validation (including a metering arrangement discrepancy) moderate confidence in the project's data integrity. The monitoring report dates from 2009, making the record over 15 years old.

Red Flags

  • Baseline method is stated as 'project-specific' in the monitoring report but 'jurisdictional' in the validation report — an unresolved contradiction that affects the credibility of the emission factor basis.
  • No verified ERR figure is available in the extracted record; only the PDD lifetime estimate (57,931 tCO₂e) and the monitoring-period claim (10,279 tCO₂e) are present.
  • 15 material findings were raised at validation, including a discrepancy between the registered PDD and actual site metering (common vs. individual meters), requiring a corrective action to the monitoring plan.
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.
  • The sole monitoring report is dated October 2009, leaving a gap of nearly a decade before the crediting period ended in July 2017 with no further monitoring evidence in the record.

Credit Vintages

IssuedRetiredAvailable
2011
10,373010,373
Total10,373010,373

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

0% justified for grid displacement

Baseline

Method contradicts across documents

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26AMS I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents