Bundled Charmadi Mini Hydel and Aniyur Hole Small Hydro Project at Karnataka, India.
#1297of 1935 in Renewable energy#695of 975 in India#1021of 1459 in CDM (UNFCCC)#421of 806 in AMS-I.D
Audit Analysis
A small-scale grid-connected hydro project in Karnataka using a standardised AMS methodology with a jurisdictional baseline and investment-test additionality. The fundamental design is sound for a hydro generation project, but the validation report flagged eight material findings related to ER calculation errors, incorrect monitoring references, and documentation inconsistencies, and the overall extraction confidence is low with no monitoring report available.
Red Flags
- Eight material findings in the validation report include incorrect years in the ER calculation sheet (CAR-03) and a formula that included empty cells (CAR-05), raising concerns about the accuracy of the claimed emission reductions.
- The PDD states a total of 183,666 ERs while the validation report states 26,238 ERs; although the ratio (≈7×) matches the 7-year crediting period, the inconsistent presentation across documents creates ambiguity about whether the figures are annual or lifetime.
- Minimum extraction confidence is rated low and one of the four evidence documents is typed as 'unknown', limiting the ability to fully verify project claims.
- No monitoring report was found in the available documents, so actual performance against the claimed ERs cannot be assessed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 29,558 | 0 | 29,558 | |
| Total | 29,558 | 0 | 29,558 |
Risk Indicators
Investment test present; VVB confirmation not explicitly sta
Hydro generation – inherently low reversal risk; no reversal
0% deduction, deemed negligible – appropriate for grid-conne
Jurisdictional grid EF (0.8894, 2023), reassessed 2023
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated – dual-channel risk cannot
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →