Bundled Clean Energy Generation Project in Tirunelveli District, Tamilnadu
#47of 975 in India#49of 1459 in CDM (UNFCCC)#31of 806 in AMS-I.D
Audit Analysis
A CDM wind energy project in Tamil Nadu, India, validated by Lloyd's Register with a jurisdictional grid-emission-factor baseline and a VVB-confirmed investment additionality test. The verified first-year emissions reductions (12,798 tCO₂) fall below the validation estimate (15,666 tCO₂), indicating conservative crediting. Twelve material findings were identified at validation and subsequently resolved, but the initial PDD quality issues and several data gaps (CORSIA/CCP status, grievance mechanism) temper confidence.
Red Flags
- Twelve material findings at validation (baseline rationale, IRR depreciation error, sensitivity analysis gaps, QA/QC inadequacy, crediting-period start date) — all resolved but indicating a weak initial PDD
- ERR contradiction: monitoring report (12,798 tCO₂) is lower than validation report (15,666 tCO₂); basis of comparison (first-year vs. lifetime) is ambiguous across documents
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
- Grid emission factor is from 2007; no baseline reassessment date is recorded in the extracted documents
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
Negligible, justified for wind-to-grid
Jurisdictional grid-EF baseline (2007)
Mentioned but FPIC and grievance mechanism not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →