Skip to main content
CDMHydroBrazilAMS-I.D

Bundled Estelar CDM Project

CDM-2994 ↗

#601of 1935 in Renewable energy#26of 211 in Brazil#406of 1459 in CDM (UNFCCC)#210of 806 in AMS-I.D

5.6/ 10
Integrity
6.8
Transparency
4.5
Claim Safety
5.5
Documentation
4.5

Audit Analysis

The Bundled Estelar CDM hydro project in Brazil has a solid additionality assessment (combined test, VVB-verified by Bureau Veritas) and a jurisdictional baseline using a 2007 grid emission factor of 0.1842 tCO2/MWh. However, significant data gaps — no verified ERR figures, no monitoring period, low extraction confidence, and a contradiction in the leakage justification between the validation report and an appendix — limit confidence in the project's overall quality and transparency.

Red Flags

  • Contradiction in leakage treatment: the validation report (2010) states leakage was 'deemed negligible' while an appendix describes it as 'quantified' — the basis for the 0% deduction is unclear
  • No verified ERR figures or monitoring period found in the extracted record, making it impossible to confirm the claimed 69,939 tCO2e
  • Low extraction confidence across the document set, indicating at least one key document was poorly readable
  • One evidence document is classified as 'unknown' type, reducing traceability

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test, VVB-verified

Permanence

Hydro infrastructure, no reversals

Leakage

0% deduction, contradictory justification

Baseline

Jurisdictional, grid EF 0.1842

Safeguards

Mentioned, FPIC/grievance not detailed

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents