Bundled Estelar CDM Project
#601of 1935 in Renewable energy#26of 211 in Brazil#406of 1459 in CDM (UNFCCC)#210of 806 in AMS-I.D
Audit Analysis
The Bundled Estelar CDM hydro project in Brazil has a solid additionality assessment (combined test, VVB-verified by Bureau Veritas) and a jurisdictional baseline using a 2007 grid emission factor of 0.1842 tCO2/MWh. However, significant data gaps — no verified ERR figures, no monitoring period, low extraction confidence, and a contradiction in the leakage justification between the validation report and an appendix — limit confidence in the project's overall quality and transparency.
Red Flags
- Contradiction in leakage treatment: the validation report (2010) states leakage was 'deemed negligible' while an appendix describes it as 'quantified' — the basis for the 0% deduction is unclear
- No verified ERR figures or monitoring period found in the extracted record, making it impossible to confirm the claimed 69,939 tCO2e
- Low extraction confidence across the document set, indicating at least one key document was poorly readable
- One evidence document is classified as 'unknown' type, reducing traceability
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-verified
Hydro infrastructure, no reversals
0% deduction, contradictory justification
Jurisdictional, grid EF 0.1842
Mentioned, FPIC/grievance not detailed
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →