Bundled Grid Connected Wind power project by Maris Group
#477of 1935 in Renewable energy#246of 975 in India#310of 1459 in CDM (UNFCCC)#168of 806 in AMS-I.D
Audit Analysis
A standard CDM grid-connected wind project in India using the well-established AMS-I.D methodology, with VVB-confirmed investment additionality and a jurisdictional baseline. However, ten material findings in the verification record (including inconsistent emission calculations, missing monitoring plan details, and a missing host-country approval letter) raise documentation-quality concerns, and a contradiction in the claimed ERR figures within the same monitoring report undermines data reliability. The verified emissions reductions for the 14-month monitoring period delivered roughly 86% of the pro-rata lifetime expectation, which is within normal wind-resource variability.
Red Flags
- Ten material findings (CAR01–CAR08, CL01, CL02) in the verification record, including inconsistent emission-reduction calculations (CAR05), a monitoring plan lacking measurement methods and calibration details (CAR06), and a missing host-country Letter of Approval (CAR01)
- Contradiction within the same monitoring report (2022-06-13): claimed ERR appears as both 5,526 and 47,265 tCO₂e, creating ambiguity about the true per-period claim
- Corrective-actions list is empty despite ten material findings, making it unclear whether all issues were resolved before issuance
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Investment test confirmed by VVB
Wind power – no carbon-stock reversal risk
0% deemed negligible, appropriate for grid wind
Jurisdictional method, standard CDM practice
Safeguards mentioned but FPIC and grievance mechanism not detailed
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →