Skip to main content
CDMWindIndiaAMS-I.D

Bundled Grid Connected Wind power project by Maris Group

CDM-7335 ↗

#477of 1935 in Renewable energy#246of 975 in India#310of 1459 in CDM (UNFCCC)#168of 806 in AMS-I.D

5.8/ 10
Integrity
6.0
Transparency
5.5
Claim Safety
6.0
Documentation
5.5

Audit Analysis

A standard CDM grid-connected wind project in India using the well-established AMS-I.D methodology, with VVB-confirmed investment additionality and a jurisdictional baseline. However, ten material findings in the verification record (including inconsistent emission calculations, missing monitoring plan details, and a missing host-country approval letter) raise documentation-quality concerns, and a contradiction in the claimed ERR figures within the same monitoring report undermines data reliability. The verified emissions reductions for the 14-month monitoring period delivered roughly 86% of the pro-rata lifetime expectation, which is within normal wind-resource variability.

Red Flags

  • Ten material findings (CAR01–CAR08, CL01, CL02) in the verification record, including inconsistent emission-reduction calculations (CAR05), a monitoring plan lacking measurement methods and calibration details (CAR06), and a missing host-country Letter of Approval (CAR01)
  • Contradiction within the same monitoring report (2022-06-13): claimed ERR appears as both 5,526 and 47,265 tCO₂e, creating ambiguity about the true per-period claim
  • Corrective-actions list is empty despite ten material findings, making it unclear whether all issues were resolved before issuance

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Investment test confirmed by VVB

Permanence

Wind power – no carbon-stock reversal risk

Leakage

0% deemed negligible, appropriate for grid wind

Baseline

Jurisdictional method, standard CDM practice

Safeguards

Safeguards mentioned but FPIC and grievance mechanism not detailed

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents