Bundled Grid Connected Wind power project from Tamilnadu, India
#43of 1935 in Renewable energy#29of 975 in India#29of 1459 in CDM (UNFCCC)#16of 806 in AMS-I.D
Audit Analysis
A CDM wind power project in Tamil Nadu, India, using the standard AMS-I.D methodology with a jurisdictional grid-emission-factor baseline. Additionality was confirmed via an investment test by TÜV NORD CERT, and the project presents no reversal risk typical of avoidance-type renewable energy. The main concerns are an internal contradiction in the claimed ERR figures within the same monitoring report and the absence of CORSIA/CCP eligibility information.
Red Flags
- Two different claimed ERR values (6,330 and 30,525) appear in the same monitoring report dated 2021-08-25, creating ambiguity about the correct ex-ante estimate for the monitoring period
- 26 Corrective Action Requests were raised during verification, indicating a non-trivial number of documentation or methodological issues that had to be resolved before registration
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 9,979 | 0 | 9,979 | |
| Total | 9,979 | 0 | 9,979 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deemed negligible, justified for wind
Jurisdictional grid EF, standard method
Safeguards mentioned, FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →