Skip to main content
CDMWindIndiaAMS-I.D

Bundled Grid Connected Wind power project from Tamilnadu, India

CDM-3493 ↗

#43of 1935 in Renewable energy#29of 975 in India#29of 1459 in CDM (UNFCCC)#16of 806 in AMS-I.D

6.9/ 10
Integrity
7.5
Transparency
6.5
Claim Safety
6.5
Documentation
7.0

Audit Analysis

A CDM wind power project in Tamil Nadu, India, using the standard AMS-I.D methodology with a jurisdictional grid-emission-factor baseline. Additionality was confirmed via an investment test by TÜV NORD CERT, and the project presents no reversal risk typical of avoidance-type renewable energy. The main concerns are an internal contradiction in the claimed ERR figures within the same monitoring report and the absence of CORSIA/CCP eligibility information.

Red Flags

  • Two different claimed ERR values (6,330 and 30,525) appear in the same monitoring report dated 2021-08-25, creating ambiguity about the correct ex-ante estimate for the monitoring period
  • 26 Corrective Action Requests were raised during verification, indicating a non-trivial number of documentation or methodological issues that had to be resolved before registration
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed

Credit Vintages

IssuedRetiredAvailable
2012
9,97909,979
Total9,97909,979

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deemed negligible, justified for wind

Baseline

Jurisdictional grid EF, standard method

Safeguards

Safeguards mentioned, FPIC/grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents