Skip to main content
CDMWindIndiaAMS-I.D

Bundled Grid Connected Wind Power Project in Tamilnadu by Shri Ramalinga Mills Limited

CDM-5220 ↗

#1220of 1935 in Renewable energy#646of 975 in India#941of 1459 in CDM (UNFCCC)#399of 806 in AMS-I.D

4.8/ 10
Integrity
6.0
Transparency
3.5
Claim Safety
5.0
Documentation
4.0

Audit Analysis

A CDM wind power project in Tamil Nadu with a VVB-confirmed investment additionality test and a jurisdictional baseline, but the record is thin: no monitoring reports, no verified emissions reductions, and an open Forward Action Request on REC double-claiming. The low extraction confidence and absence of post-validation data limit the ability to confirm that claimed credits were actually delivered.

Red Flags

  • One Forward Action Request (FAR) regarding REC benefits remains open, creating a potential double-claiming risk between renewable energy certificates and CDM credits.
  • No monitoring reports or verified emissions reductions figures are present in the extracted record, so actual delivery against the 304,000 tCO₂e lifetime claim cannot be confirmed.
  • Minimum extraction confidence is rated low, indicating at least one key document was poorly readable and the extracted data may be incomplete.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

Deemed negligible, reasonable for wind

Baseline

Jurisdictional grid EF (2009)

Safeguards

Mentioned; FPIC & grievance not stated

Double-claim

Open FAR on REC benefits; CORSIA/CCP unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26AMS ID

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents