Bundled Solar Energy Project in Madhya Pradesh by EnvironmentFirst, India
#1509of 1935 in Renewable energy#835of 975 in India#1279of 1459 in CDM (UNFCCC)#508of 806 in AMS-I.D
Audit Analysis
A CDM bundled solar project in Madhya Pradesh with a jurisdictional baseline and VVB-confirmed additionality, but critically lacking any monitoring-period data to verify actual credit delivery. A seven-fold discrepancy between the PDD and validation report on total estimated emission reductions raises serious data-reliability concerns, and the absence of any verified monitoring figures means the project's real-world performance cannot be assessed.
Red Flags
- Total estimated emission reductions differ by a factor of ~7 between the PDD (144,068 tCO₂e) and the validation report (20,581 tCO₂e), a discrepancy that undermines confidence in the project's quantification
- No monitoring reports or verified emission reduction figures are available for the full 7-year crediting period (2016–2023), making it impossible to confirm actual delivery
- 21 Corrective Action Requests were raised during validation, indicating significant initial documentation deficiencies (though all were subsequently closed)
- Leakage treatment is inconsistent between the PDD (described as quantified) and the validation report (deemed negligible), creating ambiguity about the actual leakage assessment
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed, test type unspecified
Avoidance project, no reversal risk
0% deduction, PDD/VR inconsistency
Jurisdictional grid EF, 2014 Combined Margin
Mentioned, no FPIC or grievance detail
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →