Bundled wind energy generation projects in Gujarat, India

VCS-412 ↗

#829of 1935 in Renewable energy#425of 975 in India#518of 1339 in Verra (VCS)#643of 1287 in ACM0002

5.3/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
6.0
Documentation
4.0

Audit Analysis

A long-running bundled wind energy project in Gujarat with a fundamentally sound design (jurisdictional baseline, regulatory additionality confirmed by the VVB, no reversal risk), but undermined by persistent meter calibration delays, a large volume of unresolved corrective actions, and significant documentation inconsistencies across multiple verification cycles. The project's core claim is reasonable for a renewable energy displacement activity, yet operational data quality concerns and the absence of a buffer pool limit confidence in the integrity of reported emission reductions.

Red Flags

  • Repeated meter calibration delays (2016-2017, 2020-2021) with only a conservative -1% error factor applied, raising questions about the accuracy of generation data underpinning the ERR
  • Over 30 corrective actions required across multiple verification cycles, including unresolved inconsistencies in emission factors, project capacity, and methodology applicability criteria
  • Physical site visit was not conducted during the validation process, meaning project implementation status and monitoring plan could not be independently confirmed
  • No buffer pool percentage stated in any available document, leaving no quantified safeguard against potential reversal or over-crediting
  • Grid emission factor inconsistency: 0.9777 tCO2/MWh (2022 verification report) versus 940.22 (2010 monitoring report, likely kgCO2/MWh), with no clear explanation for the unit or value discrepancy

Credit Vintages Exhausted

IssuedRetiredAvailable
2007
78,04478,0440
2008
91,08691,0860
2009
90,02390,0230
2010
84,79984,7990
2011
97,41697,4160
2012
89,73189,7310
2013
86,16686,1660
2014
84,83284,8320
2015
126,126126,1260
2016
86,06086,0600
2017
76,76176,7610
2018
77,45477,4540
2019
81,30881,3080
2020
62,16462,1640
2021
79,42779,4270
Total1,291,3971,291,3970

Risk Indicators

Additionality

Regulatory test, VVB-confirmed

Permanence

Wind displacement, no reversal risk

Leakage

Deemed negligible, reasonable for wind

Baseline

Jurisdictional, reassessed 2017

Safeguards

Grievance mechanism present, FPIC not conducted

Double-claim

CORSIA excluded, CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents