Skip to main content
CDMWindIndiaGeneral Methodologyv2.1

Bundled Wind Energy Project in Indian States

CDM-10333 ↗

#1053of 1935 in Renewable energy#535of 975 in India#780of 1459 in CDM (UNFCCC)

5.0/ 10
Integrity
6.5
Transparency
3.5
Claim Safety
5.0
Documentation
4.0

Audit Analysis

A standard CDM grid-connected wind project in India with a properly validated investment-test additionality assessment and a jurisdictional grid baseline. However, the extracted record contains no monitoring or verification data, a ten-fold discrepancy in claimed ERR between documents, and low extraction confidence, leaving the project's actual performance unverified.

Red Flags

  • Ten-fold discrepancy in total ERR: the validation report (2016) states 6,764 tCO2e while a 2013 appendix states 67,639.67 tCO2e — the basis for this difference is unexplained in the extracted record
  • No monitoring period, verified ERR, or verification report data found in any available document, leaving actual credit delivery entirely unconfirmed
  • Minimum extraction confidence rated low, indicating at least one key document was poorly readable and data completeness cannot be assured

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% with negligible justification, consistent with grid-conne

Baseline

Jurisdictional grid EF (0.9583, 2012), standard for CDM wind

Safeguards

Safeguards mentioned; benefit sharing described; no FPIC or

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents