Bundled Wind Power generation project by Savita Oil Technologies Ltd., India
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB using an investment test in the validation report.
missing The latest monitoring report does not address leakage, and the record shows no buffer pool or reversal detail.
Transparency
verified The project has named verification coverage from TUV SUD South Asia Pvt Ltd and a defined monitoring period in the monitoring report.
missing The monitoring report includes several corrective actions and inconsistencies, including mismatched monitoring-period references and missing calibration evidence.
Claim Safety
verified The project is explicitly marked not CORSIA-eligible, which reduces some dual-market claim risk.
missing Emissions-reduction figures are inconsistent across documents, and the latest report leaves leakage justification unresolved.
Documentation
verified Multiple official documents were available, including validation, monitoring, and issuance records, and extraction confidence is high.
missing The monitoring report still requires several follow-up submissions and clarifications, showing incomplete documentation quality.
Detailed Analysis
Integrity
The validation report confirms additionality through an investment test and the VVB is identified as TUV SUD South Asia Pvt Ltd, which supports the project’s core integrity case. However, the monitoring report states leakage is not addressed, buffer pool coverage is not found in the extracted record, and reversal handling is not addressed, which weakens permanence and leakage confidence. The project is a wind power activity, so permanence risk is lower than for land-use projects, but the documentation still leaves important accounting gaps.
Transparency
The project has a named verifier and a clearly stated monitoring period in the monitoring report, which helps transparency. At the same time, the report lists multiple corrective actions, including unclear calibration frequency, missing calibration certificates, and a mismatch between the summary sheet and the stated monitoring period. The record also shows no usage-monitoring method and no grid emission factor details in the extracted facts, limiting public MRV clarity.
Claim Safety
Claim safety is weakened by contradictory emissions-reduction figures across documents: the monitoring report claims 26,030, while validation records also show 30,096 and 88,358 in different places. I privileged the latest monitoring report for the claimed amount and the later validation figure for the verified amount because they are more recent and closer to issuance, but the spread still signals reliability risk. The latest monitoring report also says leakage is not addressed, which increases over-crediting concern even though the project is not CORSIA-eligible.
Documentation
Documentation breadth is moderate because the record includes validation, monitoring, PDD, and issuance documents, and extraction confidence is high. Still, the monitoring report itself lists many outstanding items, including calibration certificates, ER sheet support, and clarification of substation changes and apportioning procedures. The crediting period also differs between the PDD and the later monitoring report, so the file is not fully internally consistent.
Overall
I privileged the later monitoring report for the latest claimed emissions reductions and leakage treatment, and the later validation report for the verified amount, because they are more recent than the PDD and earlier monitoring materials. The contradictions are material: additionality test type differs between the PDD and validation report, emissions-reduction totals vary sharply across documents, leakage treatment changes from negligible to not addressed, and the crediting period differs between the PDD and monitoring report. These inconsistencies reduce confidence in the accounting record, even though the project remains a registered VCS wind project with VVB-verified additionality.
Audit Analysis
This is a registered VCS wind project with VVB-verified additionality, but the evidence record shows several unresolved monitoring and accounting issues. The main concerns are inconsistent emissions-reduction figures across documents, leakage not being addressed in the latest monitoring report, and incomplete clarity on safeguards and monitoring procedures.
Project Description
Proponent: Savita Oil Technologies Limited Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: AMS-I.D. Estimated annual GHG reductions: 15000 tCO2e Region: Asia Registration date: 2012-09-13
Red Flags
- The latest monitoring report says leakage is not addressed, while an earlier report treated it as negligible.
- There are major inconsistencies in emissions-reduction totals across validation and monitoring documents, including 26,030 versus 88,358 and 30,096.
- The monitoring report lists multiple corrective actions, including calibration gaps, substation changes, and missing supporting records.
- The project is not CORSIA-eligible, but CCP status is not stated.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 13,791 | 13,791 | 0 | |
| 2011 | 16,305 | 16,305 | 0 | |
| 2012 | 17,683 | 0 | 17,683 | |
| 2013 | 15,108 | 0 | 15,108 | |
| 2014 | 13,413 | 0 | 13,413 | |
| 2015 | 11,114 | 0 | 11,114 | |
| 2016 | 16,075 | 0 | 16,075 | |
| 2017 | 14,965 | 0 | 14,965 | |
| Total | 118,454 | 30,096 | 88,358 |
Cosa migliorerebbe questo punteggio
- Provide a reconciled emissions-reduction schedule that explains all differences between the monitoring, validation, and issuance figures.
- Submit the missing calibration certificates, clarify leakage treatment, and document the safeguard process including FPIC and stakeholder consultation records.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
No reversal detail or buffer evidence
Latest report leaves leakage unaddressed
Project baseline stated, reassessment timing missing
Grievance mechanism present, FPIC not shown
Not CORSIA-eligible; CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →