Bundled Wind Power Project at Tamil Nadu, India
#1510of 1935 in Renewable energy#836of 975 in India#1280of 1459 in CDM (UNFCCC)#509of 806 in AMS-I.D
Audit Analysis
A CDM wind power project in Tamil Nadu with a confirmed investment-test additionality and jurisdictional baseline, but undermined by 13 material findings in the validation report, a seven-fold discrepancy in the claimed emission reduction figure between the PDD and the validation report, and a low-confidence extraction record with no monitoring reports available. The project's core design is sound for a wind displacement project, yet the volume of documentation deficiencies and calculation errors raises meaningful concerns about the reliability of the validated credit volume.
Red Flags
- Seven-fold discrepancy in total emission reductions: the PDD (Jan 2015) states 74,368 tCO₂e while the validation report (Mar 2015) validates only 10,624 tCO₂e, a gap that is never explicitly reconciled in the available documents
- 13 material findings in the validation report, including errors in IRR calculations, emission-factor unit errors, monitoring-plan deficiencies, and missing financial and stakeholder-engagement evidence
- Low extraction confidence across the document set, with one document of unknown type and no monitoring or verification reports present in the evidence list
- Contradictory leakage treatment across two PDD versions: one states leakage was 'quantified' (Jan 2014) while the later version (Jan 2015) states it was 'deemed negligible'
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, contradictory PDD versions
Jurisdictional, reassessment timing not stated
Mentioned but stakeholder evidence missing
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →