Audit Analysis
A CDM wind project in India with a VVB-confirmed investment additionality test, a jurisdictional grid-emission-factor baseline, and conservative verified reductions that exceeded the PDD estimate for the monitoring period. The project carries no inherent permanence risk (wind displaces grid electricity) and a 0% leakage deduction is well-justified for this technology. Minor concerns include a dated 2011 grid emission factor, a meter-accuracy discrepancy during early monitoring, and a documentation inconsistency on whether the baseline is 'jurisdictional' or 'project-specific'.
Red Flags
- Grid emission factor of 0.9161 tCO2/MWh is from 2011 and has not been updated in the available documents, potentially overstating reductions if the Indian grid has decarbonised since then.
- Energy meters of accuracy class 0.5s were used instead of the registered 0.2s class for WEC WES-RE2-T 34 until April 2013, introducing measurement uncertainty in early monitoring data.
- The validation report (2012) describes the baseline as 'project' while the 2021 monitoring report calls it 'jurisdictional' — an inconsistency that could affect baseline credibility if the project-specific characterisation was the original intent.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 7,656 | 0 | 7,656 | |
| 2017 | 21,606 | 0 | 21,606 | |
| 2022 | 19,636 | 0 | 19,636 | |
| Total | 48,898 | 0 | 48,898 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deemed negligible, appropriate for wind
Jurisdictional but grid EF from 2011; doc inconsistency
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →