Bundled Wind Power Project by DTC and VST
#1088of 1935 in Renewable energy#566of 975 in India#816of 1459 in CDM (UNFCCC)#354of 806 in AMS-I.D
Audit Analysis
A CDM wind power project in India with confirmed additionality via an investment test and inherently low permanence risk, but limited by the absence of any monitoring-period data, a project-specific baseline, and five corrective actions raised during validation that flagged internal inconsistencies in the PDD. The low extraction confidence and lack of verified emission reduction figures prevent a stronger assessment of claim safety.
Red Flags
- CAR 4 flagged an inconsistency in estimated emission reductions between PDD sections A.4.3 and B.6.4, raising questions about the robustness of the ex-ante ERR estimate of 38,740 tCO2e
- No monitoring-period data or verified ERR figures are available in the extracted record, making it impossible to confirm actual delivery against the claimed total
- Low extraction confidence across the document set means key fields (FNRB, usage rates, baseline reassessment, buffer pool) could not be confirmed
- Contradictions between the PDD and validation report on baseline method (jurisdictional vs. project) and crediting period dates indicate internal document inconsistencies
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Wind – no reversal risk
0% – negligible for grid wind
Project-specific, no reassessment date
Mentioned but FPIC/grievance not documented
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →