Bundled wind power project by Kalani Industries Pvt Ltd.
#1411of 1935 in Renewable energy#766of 975 in India#1144of 1459 in CDM (UNFCCC)#465of 806 in AMS-I.D
Audit Analysis
A CDM wind power project in India validated by SGS UK with a jurisdictional grid baseline and investment-test additionality, but the validation report flagged six material findings including a hand-changed date on the host-country approval letter and a stakeholder challenge to the project's viability without CDM revenue. No verified emissions reductions or monitoring-period data were found in the extracted record, and extraction confidence was low, leaving the project's actual performance unconfirmed.
Red Flags
- Hand-changed correction on the date of the Host Country Approval letter identified as a material finding in the validation report
- Global stakeholder comment questioned whether the project would be viable without CDM revenue, undermining the additionality claim
- No verified emissions reductions or monitoring-period data found in any available document
- Eight corrective actions were required at validation, including evidence for baseline data authenticity and detailed financial calculations
- Low extraction confidence indicates at least one key document was poorly readable, limiting the reliability of the extracted record
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but evidence gaps flagged
Avoidance project, no reversal risk
0% deemed negligible, standard for wind
Jurisdictional grid EF, scenario ID questioned
Mentioned but FPIC and grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →