Bundled Wind Power Project by M/s. D. J. Malpani
#827of 1935 in Renewable energy#423of 975 in India#579of 1459 in CDM (UNFCCC)#282of 806 in AMS-I.D
Audit Analysis
A CDM wind power project in India with sound technical fundamentals — jurisdictional baseline, VVB-confirmed combined additionality test, and a reasonable negligible-leakage claim — but the available record is limited to the validation report and PDD, with no monitoring or verification data to confirm actual credit delivery. The low extraction confidence and absence of any post-validation documentation prevent a robust assessment of real-world performance.
Red Flags
- No monitoring or verification reports are present in the extracted record; the 11,978 tCO2e lifetime claim cannot be cross-checked against any verified figure.
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, which undermines confidence in the completeness of the available evidence.
- CORSIA eligibility and CCP status are not stated in any available document, leaving double-claim risk unassessed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 22,285 | 0 | 22,285 | |
| 2016 | 18,622 | 0 | 18,622 | |
| 2018 | 30,753 | 0 | 30,753 | |
| Total | 71,660 | 0 | 71,660 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
Negligible, reasonable for grid wind
Jurisdictional, 2016 grid EF
Mentioned but FPIC and grievance mechanism not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →