Skip to main content
UCRRajasthan IndiaACM0002

Bundled Wind power project in Jaisalmer (Rajasthan in India) managed by Enercon (India)Ltd.

UCR-510 ↗

#1805of 1935 in Renewable energy#5of 8 in Rajasthan India#277of 433 in Universal Carbon Registry (UCR)#1266of 1287 in ACM0002

2.9/ 10
Integrity
3.5
Transparency
1.5
Claim Safety
4.0
Documentation
2.0

Audit Analysis

A bundled wind energy project in Rajasthan using the well-established ACM0002 methodology with a jurisdictional baseline and a 0.9 tCO₂/MWh grid emission factor. The project design is inherently low-risk (avoidance of grid emissions, no reversal risk), but the evidence base is extremely thin — only a single PDD was available, with no verification report, monitoring report, or VVB documentation to confirm additionality or validate the 104,324 tCO₂e claim.

Red Flags

  • Only one document (the PDD) is in the evidence base; no verification report, monitoring report, or VVB report was available for review
  • No VVB is identified and additionality verification status is entirely unconfirmed in the extracted record
  • No verified ERR figure exists to cross-check against the 104,324 tCO₂e claimed in the PDD

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type and VVB verification not stated in extracted record

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, deemed negligible — consistent with wind displacement

Baseline

Jurisdictional method, 2013 grid EF; no reassessment date stated

Safeguards

Safeguards mentioned but no FPIC or grievance mechanism details found

Double-claim

CORSIA and CCP status both not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.