Bundled Wind Power Project In Jamnagar, Gujarat

VCS-1079 ↗

4.7 / 10
Integrity
5.2
Transparency
4.6
Claim Safety
4.1
Documentation
5.0

Score Breakdown

Integrity

verified Additionality was tested through an investment analysis and confirmed by the VVB in the monitoring report.

missing Leakage was set at 0% but the justification was not addressed, and reversal risk was not addressed in the extracted record.

Transparency

verified The project has a named VVB, a defined monitoring period, and matching claimed and verified emission reductions in the latest extracted figures.

missing The monitoring record does not state a usage monitoring method, and the extracted documents contain contradictions on reported emission reductions and the crediting period.

Claim Safety

verified The project is an avoidance project under a renewable energy methodology, which generally lowers reversal risk compared with removal projects.

missing The baseline is project-specific rather than a more robust standardized or jurisdictional baseline, and leakage treatment is not justified despite a 0% deduction.

Documentation

verified Multiple official documents were available, including validation, monitoring, PDD, and issuance records, and extraction confidence was high.

missing Several corrective actions were required, and the record shows inconsistencies between documents on title, credited volumes, safeguards, and crediting period.

Detailed Analysis

Integrity

The monitoring report shows an investment test for additionality and says the VVB, Bureau Veritas Certification, confirmed it, which supports the project’s core eligibility case. At the same time, the report lists several corrective actions, including issues with the investment analysis and PDD references, and leakage was assigned a 0% deduction without any justification. Reversal risk is not meaningfully discussed in the extracted record, so permanence confidence is only moderate for an avoidance project.

Transparency

The project has a named verifier, a defined monitoring period, and the latest extracted figures show claimed and verified emission reductions both at 13,123 tCO2e. However, the monitoring record does not state a usage monitoring method, and the extracted documents contain contradictions on emission reduction totals and the crediting period. Those inconsistencies reduce transparency because it is harder to reconcile which figures should be relied on.

Claim Safety

Claim safety is weakened by the project-specific baseline and the lack of a clear leakage justification, even though the project is a wind avoidance activity under AMS-I.D. The project is marked as not CORSIA-eligible, which helps reduce dual-market concern, but there is no CCP status available. Because the record shows unresolved methodological and reporting issues, over-crediting risk cannot be ruled out confidently.

Documentation

Documentation breadth is decent because the extracted record includes validation, monitoring, PDD, and issuance materials, and extraction confidence is high. Still, the monitoring report required multiple corrective actions, and the documents conflict on project title, credited volumes, safeguards, and crediting period. Those contradictions suggest the file is usable but not fully clean or internally consistent.

Overall

The project’s strongest point is that additionality was tested through an investment analysis and independently confirmed, but that is offset by documentation weaknesses and unresolved methodological gaps. I privileged the later validation-report figures for verified and claimed emission reductions because they are the most recent values in the contradiction set, while the later monitoring-report crediting period was also used as the latest period stated; both choices are conservative but the conflicts still lower confidence. The project is not CORSIA-eligible, but the combination of corrective actions, weak leakage treatment, and inconsistent records keeps the overall assessment below average.

Audit Analysis

This wind project has some positive integrity signals, including a VVB-confirmed investment test and no material findings in the monitoring report. However, several corrective actions were still required, leakage was not addressed, and key documentation contains contradictions on credited volumes and the crediting period, which weakens confidence in the claims.

Red Flags

  • The monitoring report required multiple corrective actions, including issues with the investment analysis and project documentation.
  • Credited and verified emission reductions conflict across documents, and the project’s crediting period also differs between monitoring reports.

Credit Vintages Exhausted

Issued Retired Available
2010
2,918 2,918 0
2011
27,582 27,582 0
Total 30,500 30,500 0

Cosa migliorerebbe questo punteggio

  • Provide a clear, documented justification for the zero leakage deduction and explicitly address reversal/permanence treatment in the monitoring evidence.
  • Resolve the document inconsistencies on credited volumes, crediting period, project title, and safeguards, and publish a clean reconciled audit trail.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, reversal risk not addressed

Leakage

0% deduction without justification

Baseline

Project baseline, reassessment not stated

Safeguards

No FPIC or grievance mechanism found

Double-claim

Not CORSIA-eligible; no CCP approval stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-15 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti