Skip to main content
CDMWindIndiaAMS-I.D

Bundled Wind Power Project in Maharashtra

CDM-4197 ↗

#658of 1935 in Renewable energy#331of 975 in India#449of 1459 in CDM (UNFCCC)#229of 806 in AMS-I.D

5.5/ 10
Integrity
5.5
Transparency
6.0
Claim Safety
4.5
Documentation
6.5

Audit Analysis

A CDM wind project in Maharashtra with a solid jurisdictional baseline and VVB-confirmed additionality, but undermined by a striking five-fold gap between claimed and verified emissions reductions and thirteen material findings (all since resolved). The verification process ultimately constrained credits to the ex-ante estimate, limiting over-crediting risk, yet the scale of the initial over-claim and the volume of documentation deficiencies raise meaningful concerns about project management quality.

Red Flags

  • Claimed ERs of 25,576 tCO₂e are approximately 5× the verified figure of 5,783 tCO₂e, indicating a severe over-claiming episode that the VVB had to correct
  • The verified ER figure (5,783) exactly matches the ex-ante estimate in the 2010 validation report, raising the question of whether the VVB independently recalculated generation or simply applied the PDD estimate as a cap
  • Thirteen material findings (7 CARs, 6 CLs) were raised during verification, spanning additionality documentation, monitoring plan gaps, and de-bundling issues — all resolved but indicative of weak initial project documentation
  • Grid emission factor of 0.9224 tCO₂/MWh is drawn from 2009 data; no evidence of periodic EF updates was found in the extracted record

Credit Vintages

IssuedRetiredAvailable
2023
40,198040,198
Total40,198040,198

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

Deemed negligible, reasonable for wind

Baseline

Jurisdictional grid EF (0.9224, 2009)

Safeguards

Safeguards and benefit-sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in extracted record

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents