A CDM wind energy project with a jurisdictional baseline and VVB-confirmed investment additionality test, but the validation report identified 17 material findings and corrective actions spanning financial assumptions, plant load factor evidence, and procedural gaps. The absence of any verified ERR figure in the extracted record prevents assessment of actual delivery against the 74,770 tCO₂e lifetime claim. The project is fundamentally sound in design but carries moderate documentation and verification gaps.
Red Flags
- 17 material findings and corrective actions identified in the validation report, including IRR calculation inconsistencies, missing plant load factor evidence, and absent justification for zero project emissions
- No verified ERR figure found in any available document, making it impossible to confirm actual credit delivery against the 74,770 tCO₂e lifetime claim
- Contradiction between the PDD (leakage deemed negligible) and an earlier appendix (leakage quantified) creates uncertainty about the correct treatment
- Low extraction confidence across the document set, with one document of unknown type, reducing reliability of the extracted record
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance-type, no reversal risk
0% deduction, minor doc contradiction
Jurisdictional grid EF (2009)
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →