Bundled Wind Project-II of Shivashri in Sadawaghapur Maharashtra
#481of 1935 in Renewable energy#250of 975 in India#312of 1459 in CDM (UNFCCC)#170of 806 in AMS-I.D
Audit Analysis
A small-scale CDM wind project in Maharashtra with a solid combined additionality test confirmed by a reputable VVB (Applus+) and a jurisdictional baseline reassessed in 2022. However, four material findings requiring corrective action (missing PPA, O&M agreement, technical specifications, and monitoring records) and the absence of any monitoring reports or safeguards documentation (FPIC, grievance mechanism) significantly limit confidence in the project's operational integrity and transparency.
Red Flags
- Four material findings in the validation report require corrective action: missing PPA, O&M agreement, technical specifications, commissioning certificates, sample JMRs, and calibration certificates
- No monitoring reports available in the extracted record — only the validation report (July 2022) is present, leaving the 2022–2025 period unverified
- No Free, Prior and Informed Consent (FPIC) or grievance mechanism documented in any available source
- CORSIA eligibility and CCP approval status are not stated in any document
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 112,451 | 0 | 112,451 | |
| Total | 112,451 | 0 | 112,451 |
Risk Indicators
Combined test, VVB-confirmed
Wind avoidance – no reversal risk
0% – negligible for grid displacement
Jurisdictional, reassessed 2022
Mentioned but FPIC/grievance undocumented
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →