Burgos Wind Project

CDM-7980 ↗

5.6 / 10
Integrity
6.1
Transparency
5.2
Claim Safety
5.0
Documentation
6.3

Score Breakdown

Integrity

verified The validation report (2022) confirms additionality using an investment test and reports no material findings or corrective actions.

missing Baseline is project-specific (ACM0002) and the timing of any baseline reassessment is not stated in available documents; leakage is not addressed in the extracted record.

Transparency

verified The VVB is identified (RINA Services S.p.A.) and core project parameters like methodology (ACM0002 v20) and grid emission factor (0.684; 2015–2017) are provided in the extracted record.

missing Monitoring period and both claimed and verified ER totals were not found in the extracted record, reducing traceability of issued outcomes.

Claim Safety

verified Additionality is VVB-confirmed in the validation report (2022), which reduces (but does not eliminate) over-crediting risk.

missing CORSIA eligibility and CCP status are not stated in available documents, and leakage treatment is absent in the extracted record—both increase downstream claim and over-crediting risk.

Documentation

verified Multiple document types are referenced (validation report, PDD) with a recent validation date (2022-11-05) and no corrective actions required.

missing Extraction confidence is only medium and at least one source is listed as unknown, suggesting gaps in document completeness/clarity.

Detailed Analysis

Integrity

The validation report (2022) confirms additionality via an investment test and reports no material findings and no corrective actions, supporting baseline/additionality robustness. The project uses a project-specific baseline under ACM0002 (version 20), but the extracted record does not state when the baseline was last reassessed, which adds uncertainty. Leakage is flagged as not addressed in the extracted record, and no leakage deduction is provided, which weakens integrity for an electricity-displacement project where upstream or market effects may need explicit treatment.

Transparency

The extracted record identifies the VVB (RINA Services S.p.A.), the methodology (ACM0002 v20), and a grid emission factor of 0.684 with a stated year range (2015–2017), which supports partial transparency. However, the monitoring period is not stated in available documents, and neither claimed nor verified total emission reductions were found in the extracted record, preventing reconciliation of performance claims. Registry information is inconsistent with the stated standard context (listed as CDM in the extracted record), which also reduces clarity for users trying to trace credits.

Claim Safety

Because verified ER totals are not available in the extracted record, it is not possible to check for over-crediting signals such as large claim-to-verify discrepancies. Leakage is not addressed in the extracted record, which increases the risk that credited reductions could be overstated if any leakage pathways are relevant under the applied approach. CORSIA eligibility and CCP status are not stated in available documents, increasing uncertainty for buyers about how credits may be used and the risk of inappropriate claims.

Documentation

Documentation appears moderately complete: the extracted record references a validation report and PDD, with a recent validation date (2022-11-05) and no corrective actions required. Still, key operational/quantitative fields (monitoring period, claimed/verified ERs) were not found in the extracted record, indicating important evidence gaps. The minimum extraction confidence is medium and one evidence source is labeled unknown, which suggests some limitations in document readability or capture.

Overall

No contradictions were identified in the extracted record, so scores are not reduced for internal inconsistencies. The overall score is driven by VVB-confirmed additionality and the low permanence risk typical of renewable energy avoidance projects, balanced against major MRV/quantification gaps (missing monitoring period and verified ER totals) and missing leakage treatment. Note: if documentation were to fall below 3.0, transparency would be capped by the gate rule; and if integrity were below 4.0, overall would be capped at 6.0—neither gate is triggered by these scores.

Audit Analysis

The project shows moderate integrity: additionality is confirmed by the VVB via an investment test, and it is an avoidance-type renewable energy activity with no inherent reversal risk. However, key quantification elements are missing from the extracted record (notably verified ERs, monitoring period, and leakage treatment), which increases uncertainty and over-crediting risk.

Project Description

Other crediting period(s): 11 Nov 14 - 10 Nov 21 Requests for Issuance and related documentation

Red Flags

  • No verified emission reductions or monitoring period were found in the extracted record, limiting the ability to assess MRV performance.
  • Leakage is marked as not addressed, and no leakage deduction or justification is provided in the extracted record.

Credit Vintages

Issued Retired Available
2019
629,955 0 629,955
Total 629,955 0 629,955

Cosa migliorerebbe questo punteggio

  • Provide the monitoring report/verification statement with the monitoring period and the final verified emission reductions (and any adjustments) to enable claim reconciliation.
  • Document leakage assessment and, if applicable, quantify and apply a leakage deduction or provide a clear justification for negligible leakage under ACM0002.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project; no reversal risk indicated

Leakage

Leakage not addressed in extracted record

Baseline

Project-specific baseline; reassessment timing unclear

Safeguards

FPIC and grievance mechanism documented

Double-claim

CORSIA/CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti