Cam Lam KN Solar Power Plant

CDM-10530 ↗

#44of 1935 in Renewable energy#2of 80 in Vietnam#30of 1459 in CDM (UNFCCC)#28of 1287 in ACM0002

6.9/ 10
Integrity
7.0
Transparency
6.5
Claim Safety
7.0
Documentation
7.0

Audit Analysis

The Cam Lam KN Solar Power Plant is a CDM-registered solar project with a well-confirmed additionality assessment (combined test verified by Korean Standards Association) and a standard grid-emission-factor baseline. The verified emissions reductions for the 2021–2022 monitoring period (66,760 tCO₂e) are well below the pro-rata lifetime expectation, indicating conservative crediting. A contradiction in the baseline method label between the validation report and monitoring report, along with several resolved material findings, warrant moderate caution but do not undermine the project's fundamental soundness.

Red Flags

  • Baseline method is labelled 'project' in the monitoring report but 'jurisdictional' in the validation report — the two documents disagree on a fundamental methodological classification
  • Multiple material findings (GPS coordinates, PV module model substitution, missing evidence in early PDD versions) required four corrective actions before the project could proceed, indicating initial documentation quality was below standard
  • No buffer pool or permanence mechanism is documented, and no reversal events data is available, leaving the permanence risk unquantified despite the project being an avoidance-type activity

Credit Vintages

IssuedRetiredAvailable
2021
64,110064,110
Total64,110064,110

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

0% deemed negligible, reasonable for solar

Baseline

Method label contradicts between documents

Safeguards

Grievance and benefit sharing present, FPIC not stated

Double-claim

CORSIA and CCP status not explicitly stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents