Audit Analysis
The Cam Lam KN Solar Power Plant is a CDM-registered solar project with a well-confirmed additionality assessment (combined test verified by Korean Standards Association) and a standard grid-emission-factor baseline. The verified emissions reductions for the 2021–2022 monitoring period (66,760 tCO₂e) are well below the pro-rata lifetime expectation, indicating conservative crediting. A contradiction in the baseline method label between the validation report and monitoring report, along with several resolved material findings, warrant moderate caution but do not undermine the project's fundamental soundness.
Red Flags
- Baseline method is labelled 'project' in the monitoring report but 'jurisdictional' in the validation report — the two documents disagree on a fundamental methodological classification
- Multiple material findings (GPS coordinates, PV module model substitution, missing evidence in early PDD versions) required four corrective actions before the project could proceed, indicating initial documentation quality was below standard
- No buffer pool or permanence mechanism is documented, and no reversal events data is available, leaving the permanence risk unquantified despite the project being an avoidance-type activity
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 64,110 | 0 | 64,110 | |
| Total | 64,110 | 0 | 64,110 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deemed negligible, reasonable for solar
Method label contradicts between documents
Grievance and benefit sharing present, FPIC not stated
CORSIA and CCP status not explicitly stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →