CANDARLI WPP
GS-2324 ↗ · current registry ID: GS7635
#44of 295 in Turkey#77of 1801 in Gold Standard (GS)#147of 1287 in ACM0002
Audit Analysis
Candarli WPP is a 5-year Gold Standard wind project in Turkey with a solid investment-test additionality confirmed by RINA, but the record is marred by a four-fold discrepancy in claimed emission reductions between the validation report and an undated appendix, a missing verified ERR figure, and CORSIA eligibility that introduces dual-channel risk. Nine corrective actions were raised and closed during verification, indicating a thorough but initially imperfect submission. As an avoidance-type wind project, permanence and leakage risks are inherently low, but the project-specific baseline and absence of a buffer pool leave modest conservatism gaps.
Red Flags
- Claimed ERR of 62,538 tCO₂e in the validation report versus 260,320 tCO₂e in an undated appendix — a 4.2× discrepancy that cannot be reconciled without the lifetime ex-ante estimate being explicitly stated
- Verified ERR for the 2024 monitoring period is not stated in any available document, preventing any over- or under-delivery check
- CORSIA eligibility is confirmed while CCP status is not mentioned, creating potential dual-channel crediting risk
- Nine corrective actions (CR1–CR6, CAR1–CAR2, FAR1) were raised during verification, indicating the initial PDD had multiple material gaps before closure
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 1,162 | 0 | 1,162 | |
| 2022 | 55,021 | 0 | 55,021 | |
| 2023 | 52,871 | 0 | 52,871 | |
| Total | 109,054 | 0 | 109,054 |
Risk Indicators
Investment test confirmed by RINA
Wind avoidance; no reversal events
0% deduction; negligible for wind
Project-specific; no reassessment date
FPIC, grievance mechanism, benefit sharing
CORSIA-eligible; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →