Cangxi Donghe Dongxi Hydropower Station
#1354of 1935 in Renewable energy#819of 1084 in China#1084of 1459 in CDM (UNFCCC)#438of 806 in AMS-I.D
Audit Analysis
A small-scale hydropower project under CDM AMS-I.D. with a jurisdictional grid baseline and a 7-year crediting period (2017–2024) claiming 115,199 tCO₂e. The project type is inherently low-risk (avoidance, no reversal exposure), but the extracted record contains no monitoring reports, no verified emission reductions, and a low extraction confidence rating, leaving the claimed figures effectively unverifiable. A minor material finding on PDD form compliance and a contradiction in the leakage justification further temper confidence.
Red Flags
- No monitoring reports or verified emission reduction figures are present in the extracted record; the 115,199 tCO₂e claim cannot be cross-checked against actual performance.
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, which undermines reliability of all extracted facts.
- A material finding (CAR-1) was raised in the validation report regarding incomplete baseline scenario description in PDD Section A.1, with a corrective action required.
- Contradiction in leakage treatment: the PDD states leakage is 'deemed negligible' while another source characterises it as 'quantified' — the basis for the 0% deduction is ambiguous.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 17,139 | 0 | 17,139 | |
| Total | 17,139 | 0 | 17,139 |
Risk Indicators
Test required by AMS-I.D. but specific type not stated in ex
Avoidance project – no reversal risk
0% deduction, deemed negligible, but justification wording c
Jurisdictional grid EF (0.500375, 2015), reassessed at proje
Safeguards and benefit-sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →