Skip to main content
CDMHydroChinaAMS-I.D

Cangxi Donghe Fengziyan Hydroelectric Power Station

CDM-2082 ↗

#1515of 1935 in Renewable energy#956of 1084 in China#1285of 1459 in CDM (UNFCCC)#512of 806 in AMS-I.D

4.2/ 10
Integrity
4.5
Transparency
3.5
Claim Safety
5.0
Documentation
3.5

Audit Analysis

A small hydro CDM project in China using a standardized methodology (AMS-I.D. v18) with a jurisdictional baseline and a named VVB, but the extracted record contains significant gaps: no additionality test type, no verified ERR, no monitoring report, and low extraction confidence. The project is structurally sound for a hydro avoidance credit, yet the absence of monitoring data and the contradiction on leakage treatment limit confidence in the claimed 156,387 tCO₂e.

Red Flags

  • Additionality test type and VVB confirmation are not stated in any extracted document, leaving the core additionality claim unverified in the available record
  • No monitoring report or verified ERR figure is present; the claimed 156,387 tCO₂e cannot be cross-checked against actual generation
  • Contradiction between the PDD (leakage 'deemed negligible') and an unidentified document (leakage 'quantified') undermines confidence in the 0% leakage deduction
  • Low extraction confidence across the document set and one evidence document identified only as 'unknown' reduce overall data reliability

Credit Vintages

IssuedRetiredAvailable
2010
20,796020,796
2012
41,281041,281
Total62,077062,077

Risk Indicators

Additionality

Test type and VVB confirmation not stated in extracted recor

Permanence

Hydro avoidance project; no reversal risk or events

Leakage

0% deemed negligible; contradiction with another document

Baseline

Jurisdictional baseline, reassessed 2017

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents