Cangxi Donghe Likou Hydroelectric Power Station
#1482of 1935 in Renewable energy#920of 1084 in China#1232of 1459 in CDM (UNFCCC)#499of 806 in AMS-I.D
Audit Analysis
A small-scale hydro project under CDM methodology AMS-I.D. with a jurisdictional baseline and a reasonable 0% leakage deduction, but the extracted record contains no monitoring or verification data, no documented additionality test type, and low document extraction confidence. The project's core design is sound for a grid-displacement hydro scheme, yet the absence of verified performance data and safeguards detail limits confidence in the credit claim.
Red Flags
- No monitoring reports or verified ERR figures are present in the extracted record; the 124,236 tCO2e lifetime claim is entirely unverified against actual performance.
- Additionality test type and VVB confirmation are not documented in the available facts, leaving the additionality assessment opaque despite the project having been validated.
- Minimum extraction confidence is rated low, indicating at least one key source document was poorly readable, which undermines reliability of all extracted values.
- CORSIA eligibility and CCP status are both unstated, leaving the double-claiming risk unassessed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 18,676 | 0 | 18,676 | |
| Total | 18,676 | 0 | 18,676 |
Risk Indicators
VVB validated but test type undocumented
Grid-displacement hydro; no reversal risk
0% with 'deemed negligible' justification
Jurisdictional, reassessed 2017
Mentioned; FPIC and grievance not stated
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →