Vai al contenuto principale
GS Wind Turkey Documentazione completa General Methodology v2.0

CANTA WPP

GS-144 ↗

6.1 / 10
Integrity
6.4
Transparency
5.8
Claim Safety
5.6
Documentation
6.7

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB, and the project uses a combined additionality test under ACM0002.

missing Leakage is not addressed in the latest verification report, and reversal events are not addressed; no buffer pool share is stated.

Transparency

verified The project has a named VVB, a defined monitoring period, and a large verified issuance figure of 160,583 ERs.

missing The claimed amount is not stated, usage monitoring details are missing, and the record contains contradictions on leakage and the crediting period.

Claim Safety

verified The baseline was last reassessed in 2022, which is relatively recent for this project record.

missing CORSIA eligibility is true while CCP status is not stated, and leakage treatment is unclear, increasing over-claim risk.

Documentation

verified Sixteen documents were used, including a verification report, monitoring report, PDD, and appendix, with high extraction confidence.

missing Several key fields are not stated in available documents, including buffer pool coverage, FNRB, and usage-rate evidence.

Detailed Analysis

Integrity

The verification report confirms additionality through a combined test and says the VVB accepted it, which supports the project’s core environmental claim. However, the same report says leakage is not addressed, reversal events are not addressed, and no buffer pool percentage is provided, which weakens permanence and leakage robustness. The many corrective and clarification requests were closed out, but the volume of findings still suggests a non-trivial review burden.

Transparency

Transparency is moderate because the project has a named verifier, a clear monitoring period, and a verified issuance total of 160,583 ERs in the verification report. At the same time, the claimed ER amount is not stated, usage monitoring methodology is missing, and the record does not provide the grid emission factor or year. The documentation is therefore usable but incomplete for independent replication.

Claim Safety

Claim safety is weakened by the unresolved leakage treatment and by the fact that CORSIA eligibility is true while CCP status is not stated. The baseline method is project-based rather than a more standardized jurisdictional approach, which is acceptable but less conservative. The latest verification report is more cautious than the earlier monitoring report on leakage, so I privilege the newer verification report for risk assessment.

Documentation

Documentation quality is fairly good overall because 16 documents were used and extraction confidence is high. The record includes a verification report, monitoring report, PDD, and appendix, and the VVB is identified. Still, several important items are not stated in available documents, including buffer pool coverage, FNRB, and usage-rate evidence, which limits completeness.

Overall

I privileged the latest verification report when it conflicted with earlier or less specific documents, because it is the most recent assurance source and directly supports issuance. That means I treated leakage as not addressed, crediting period as 2022-02-02 to 2029-02-01, and additionality as the combined test confirmed by the VVB, even though earlier documents suggested different details. The contradictions on leakage, benefit sharing, additionality framing, and crediting period reduce reliability and keep the overall score in the mid range.

Audit Analysis

The project has some strong quality signals, including VVB-confirmed additionality, FPIC, and a grievance mechanism, but key risk controls are incomplete or unclear. The latest verification report also leaves leakage and reversal treatment insufficiently addressed, and there are document contradictions on leakage, benefit sharing, additionality framing, and the crediting period that reduce confidence.

Project Description

Developer: GTE KARBON SUSTAINABLE ENERJI EGITIM DANISMANLIK VE TICARET A.S. Type: Wind Size: Large Scale Crediting period: 2015-02-02 → 2029-02-01 Estimated annual credits: 92000 tCO2e SDGs: Goal 7: Affordable and Clean Energy, Goal 8: Decent Work and Economic Growth, Goal 15: Life On Land, Goal 13: Climate Action

Red Flags

  • Leakage is described as not addressed in the verification report, despite an earlier monitoring report indicating a quantified approach.
  • The documents conflict on the crediting period and additionality test framing, which weakens reliability of the project record.

Credit Vintages

Issued Retired Available
2015
83,662 1,673 81,989
2016
78,643 1,572 77,071
Total 162,305 3,245 159,060

Cosa migliorerebbe questo punteggio

  • Provide a clear, quantified leakage assessment and reconcile it with the earlier monitoring report.
  • Disclose buffer pool treatment, usage monitoring methodology, and CCP/registry status to reduce double-claim and permanence uncertainty.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

No buffer pool stated

Leakage

Leakage not addressed

Baseline

Project baseline, reassessed in 2022

Safeguards

FPIC and grievance mechanism present

Double-claim

CORSIA-eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-13 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti