Carabina II Wind Farm
#1356of 1935 in Renewable energy#25of 47 in Mexico#1086of 1459 in CDM (UNFCCC)#1047of 1287 in ACM0002
Audit Analysis
Carabina II is a CDM wind project in Mexico with a jurisdictional baseline and VVB-confirmed additionality, but the available record contains only a validation report with seven material findings and seven required corrective actions. No monitoring or verification reports are present, making it impossible to assess actual delivery against the 498,066 tCO₂e claimed over the 2015–2021 crediting period. The project's fundamental design (avoidance-type wind, jurisdictional baseline, negligible leakage) is sound, but the documentation gap and validation-stage quality issues limit confidence.
Red Flags
- Seven material findings in the validation report, including incorrect emission-reduction calculations, a common-practice analysis that did not follow the CDM additionality tool, and emission factors not fixed ex-ante in the PDD
- No monitoring or verification reports are available in the extracted record, so the 498,066 tCO₂e claimed over the 7-year crediting period cannot be cross-checked against verified figures
- Letter of Approval from Mexico's DNA and the SEMARNAT Environmental Impact Assessment were initially missing or pending at validation, raising questions about host-country regulatory compliance at project inception
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
Negligible, appropriate for wind
Jurisdictional grid EF (0.588, 2010)
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →