Carbono Agroporvanda
#59of 124 in Colombia#48of 99 in CerCarbono (CC)#33of 97 in AR-ACM0003
Audit Analysis
The Agroporvanda Eucalyptus afforestation project in Colombia has a VVB-verified combined additionality test and a 15% buffer pool with no reported reversals, but is undermined by 20 material findings at validation (all subsequently corrected), significant ERR figure contradictions across documents, a project-specific baseline with no stated reassessment date, and an unquantified 0% leakage deduction. The low extraction confidence and missing FNRB/usage-rate data further limit confidence in the credit figures.
Red Flags
- 20 material findings at validation including 17.2% height-measurement errors, missing land tenure certificates, missing ICA registration records, and inconsistent Eucalyptus species identification between the PDD and Project Document
- ERR figures contradict across documents: the validation report (Dec 2018) lists 81,169 tCO₂e verified while the issuance (Apr 2023) records only 68,994; the PDD claims 62,740 while the validation report claims 81,169
- Leakage deduction of 0% justified only as 'deemed negligible' with no quantified analysis, despite the project type (Eucalyptus plantation) where displaced wood demand is a plausible leakage pathway
- Low extraction confidence across the document set, indicating at least one key document was poorly readable or incomplete
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 226 | 0 | 226 | |
| 2009 | 877 | 0 | 877 | |
| 2015 | 11,072 | 0 | 11,072 | |
| Total | 12,175 | 0 | 12,175 |
Risk Indicators
Combined test, VVB-verified
mixed evidence / unresolved risk
0% deduction, unquantified
Project-specific, no reassessment date
Mentioned, FPIC/grievance absent
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →